The Construction Method of Pushing Through the Hole on the Curve of Shield Sliding Shoes
A construction method and the technology of sliding shoes, which are applied in the direction of earth square drilling, mining equipment, mining equipment, etc., to achieve the effect of minimum assembly volume, saving the amount of empty pushing materials, and saving materials.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach
[0044] The present invention is aimed at shield tunneling through the mine method tunnel that has been lined, and its specific implementation method is as follows:
[0045] Such as figure 1 and figure 2 As shown, two side-by-side steel plates are installed on the concrete guide platform of the mining method tunnel. The steel plates are fixed on the concrete guide platform with embedded self-anchoring bolts, and the uneven position of the bottom of the plate is filled with steel material support pads. The steel plates are installed in sections according to the jacking degree, and are reused; the two steel plates installed side by side are the sliding shoes 1 for the shield machine 6 to travel; butter is applied to the surface of the laid steel sliding shoes 1 .
[0046] The core-pulling method is used to drill the counter force hole 2 in the middle of the slide shoe 1, and two rows are arranged according to the jacking force, and each row has three counter force holes 2, and ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com