Construction method of novel vertical shaft horizontal rotation jet grouting pile foundation pit sealing bottom water-resisting layer

A technology of horizontal jet grouting piles and bottom sealing of foundation pits, which is applied in foundation structure engineering, construction, etc.

Active Publication Date: 2015-06-10
JINAN RAILWAY TRANSPORT GRP CO LTD
View PDF5 Cites 5 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002]The traditional deep foundation pit dewatering generally adopts the vertical water-stop curtain on the side wall of the foundation pit. After the water-stop curtain and the base water-resisting layer form a closed water-proof system, The groundwater within the scope of the foundation pit has no hydraulic connection with the groundwater outside the pit and becomes static water. As long as the groundwater above a certain depth below the bottom of the pit is pumped according to the needs, the water in the pit can be dewatered to ensure the safety of the foundation pit project. However, in Jinan Spring Karst fissure water is widely distributed in the region, and the karst channels in the basement are complex and sometimes the water-resisting layer is thin, and the basement water-repelling effect is poor. The traditional deep foundation pit dewatering method cannot achieve its due effect. Using the method of water-stop curtain on the side wall of the foundation pit + simultaneous precipitation inside and outside the pit, the water conservancy slope formed meets the requirement that the groundwater level is lower than the bottom of the pit. Resources have caused a huge waste, which has brought huge hidden dangers to the protection of spring water in Jinan area. Therefore, the above two commonly used foundation pit precipitation methods have disadvantages in Jinan area

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of novel vertical shaft horizontal rotation jet grouting pile foundation pit sealing bottom water-resisting layer
  • Construction method of novel vertical shaft horizontal rotation jet grouting pile foundation pit sealing bottom water-resisting layer

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0031] The groundwater table 4 is located above the horizontal water-resisting layer 6 at the bottom of the foundation pit.

[0032] Such as figure 1 , figure 2 As shown, the shaft 1 is set around the foundation pit. The size of the shaft 1 is a square with a side length of 4600 mm, which meets the minimum size requirements for the construction of horizontal jet grouting piles. The depth of the shaft should reach 1500 mm below the bottom elevation of the foundation pit. Radial construction of horizontal jet grouting piles 3 within the range, the radial horizontal jet grouting piles complete the full coverage of the bottom of the foundation pit, forming an artificial horizontal water-resistant layer 6 at the bottom of the foundation pit. The horizontal water-resistant layer at the bottom of the foundation pit and After the water-stop curtain 2 on the side wall of the foundation pit forms a closed water-proof system, the pit is dewatered, and the excavation of the foundation ...

Embodiment 2

[0044] The size of shaft 1 is a square with a side length of 5000 mm, which meets the minimum size requirements for the construction of horizontal jet grouting piles.

[0045] The depth of the shaft should reach 1000mm below the elevation of the bottom surface of the foundation pit. All the other technical features are the same as in Embodiment 1.

Embodiment 3

[0047]The size of shaft 1 is a square with a side length of 4000 mm, which meets the minimum size requirements for the construction of horizontal jet grouting piles. The depth of the shaft should reach 1200mm below the elevation of the bottom surface of the foundation pit. All the other technical features are the same as in Embodiment 1.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention belongs to the technical field of construction engineering and particularly relates to a construction method of a novel vertical shaft horizontal rotation jet grouting pile foundation pit sealing bottom water-resisting layer. The method includes: a vertical shaft is disposed on the periphery of a foundation pit, and a horizontal rotation jet grouting pile sealing bottom is radially constructed in the vertical shaft to serve as the foundation pit bottom horizontal water-resisting layer. The method has the advantages that the foundation pit bottom horizontal water-resisting layer is disposed manually, the foundation pit bottom horizontal water-resisting layer and a foundation pit lateral wall water stopping curtain form a sealed water resisting system, precipitation in the pit is achieved, continuous precipitation out of the pit is avoided, water resource waste is reduced, and the method is significant to spring water protection of the spring city.

Description

technical field [0001] The invention belongs to the technical field of construction engineering, and in particular relates to a construction method for a novel bottom-sealing water-resisting layer of a vertical shaft horizontal jet grouting pile foundation pit. Background technique [0002] In traditional deep foundation pit dewatering, vertical water-stop curtains are generally installed on the side walls of the foundation pit. After the water-stop curtain and the base water-resisting layer form a closed water-proof system, the groundwater within the foundation pit and the groundwater outside the pit have no hydraulic connection, and become To form static water, as long as the groundwater above a certain depth below the bottom of the pit is pumped according to the needs, the pit can be dewatered to ensure the safety of the foundation pit project. However, karst fissure water is widely distributed in the spring area of ​​Jinan, and the karst channels in the basement are compl...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02D19/16
Inventor 王国富
Owner JINAN RAILWAY TRANSPORT GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products