Combined type environment-friendly temporary water draining device and mounting construction method thereof
A construction method and environment-friendly technology, applied in water conservancy projects, municipal administration, and transportation fields, can solve problems such as waste of effective resources, complex processes, and inconsistent geometric dimensions, so as to improve the level of basic industries, save national resources, and fill the gaps in the world Effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0035] Embodiment one: if Figure 1-7 Said, a combined environment-friendly temporary drainage device, the drainage device includes a plurality of sequentially matched and overlapped drain trough segments and a catchment tank segment at the top that is matched and overlapped with the drain trough segments. The drainage channel section includes a drainage channel body 1 with a U-shaped structure and an anchor 4 arranged at the bottom of the channel body and the roadbed slope for anchoring. The water tank body 6 and the anchor piece that is arranged on the bottom of the tank body and the roadbed slope are anchored; between the described drain tank segment and the drain tank segment, and between the drain tank segment and the catchment tank segment, through the matching Corresponding to the lap connection of the female buckle, the sub buckle is a step that sinks inward on the outside of the drain tank or the sump tank, and the female buckle is sunk outward on the inside of the dr...
Embodiment 2
[0037] Embodiment two: see Figure 1-Figure 7 , a method of installation and construction using the combined environmental-friendly temporary drainage device described in Embodiment 1. During the construction of the roadbed, in view of the general practice and requirements of domestic and foreign construction, for both sides of the roadbed with a filling height higher than 2m It is necessary to carry out the construction and installation of temporary drainage devices, and the specific steps are as follows:
[0038] ① First excavate the pre-buried groove along the slope according to the design size, step on the ground from the foot of the slope to overlap and install the drainage groove segment with a length of 2m, and anchor it through the anchor;
[0039] ②While installing and constructing the section of the drainage channel, continue to fill up the subgrade. After filling up the height of two layers of soil, the slope length will be about 0.5m or 1m. Excavate th...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com