Method of beside-pillar double-side total-filling ascending re-mining overhead coal seam
It is a technology of full filling and emptying, which is applied in the direction of fillings, safety devices, ground mining, etc., and can solve problems such as rock bursts, threats to safe and efficient production, instability and damage, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0031] The following embodiments are intended to schematically illustrate and explain the present invention, and do not limit the scope of the present invention.
[0032] In order to have a clearer understanding of the technical objectives, features, and effects of the present invention, the method of filling the side of the pillar with the double side part of the column and the stepped-out coal seam will be further described in detail.
[0033] In the 1990s, the Baijiazhuang Coal Mine of Xishan Coal and Electricity Group surpassed the No. 6 coal seam and gave priority to mining the lower No. 8 coal seam. At present, the 36703 working face of No. 6 coal seam of Baijiazhuang Coal Mine is located in the mountainous area southwest of Yeyu Air Shaft. The underground is located at the right wing of the 7th panel of Nankeng 1001 level. The front left is the goaf of the 36502 working face, and the rear left is unmined. Area, the right part is the unmined area of the 36701 working face, ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com