Open trench-concealed conduit combined water discharging and salt reducing method
A combined, hidden pipe technology, applied in the field of soil improvement in saline-alkali land, can solve the problems of insignificant soil salinity, unfavorable application and promotion, and high operating costs, so as to improve water storage capacity, enhance the ability to collect rainwater and irrigation water, improve The effect of hardening
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2017-02-01
- Estimated Expiration
- Not applicable · inactive patent
Abstract
Description
technical field
[0001] The invention relates to a method for draining and reducing salt by combining an open ditch and a hidden pipe, and belongs to the technical field of saline-alkali soil improvement. Background technique
[0002] China currently has 100 million hectares of saline-alkali land, most of which are distributed in arid and semi-arid regions such as North China, Northwest and Northeast China, mainly including Xinjiang, Qinghai, Gansu, Ningxia, Shaanxi, Inner Mongolia, and northeast Shanxi. Most of them belong to the Yellow River system, and the groundwater level is significantly affected by the Yellow River system. The groundwater level is high. The local drinking wells are generally around 20m, and the groundwater level is around 2m. The main soil types are saline soil and aeolian sand, which are developed on the parent material of aeolian sand. The juvenile soil contains a lot of soluble salts, the rainfall is low, the annual average is about 180mm, the light...
Examples
Embodiment Construction
[0032]In order to make the technical solutions of the present invention clearer and clearer to those skilled in the art, the present invention will be described in further detail below in conjunction with specific examples, but the embodiments of the present invention are not limited thereto.
[0033] This embodiment provides a method for draining water and reducing salt by combining open ditch and concealed pipe, including the following steps:
[0034] Step 1: Site selection
[0035] Select plots with flat land, soil plow layer with a salt content of less than 2.1%, a pH value of 7.5 to 8.0, and an organic matter content of more than 1%, with neutral soil texture;
[0036] Step 2: Excavate salt-control drainage underground trenches and catchment trenches
[0037] Divide the plot into several grid-shaped saline-alkali plots, and excavate hidden pipe trenches at intervals of 15-20m in the grid-shaped saline-alkali plots, with a width of 1.5-2.0m and a depth of 1.5 ~ 1.8m, the...