Method for quickly greening stony deserted mountain
A rocky desertification and mountain technology, applied in the field of mountain greening, can solve the problems affecting the natural ecological landscape effect, branding of Guilin landscape, stains, etc., and achieve the effect of restoring the natural landscape and saving construction costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0030] According to the "vertical pole" planning route from bottom to top, built according to the mountain situation, the "vertical pole" is mainly made of cold-dip galvanized steel wire mesh. 30㎝, the diameter of the steel wire is 3mm, and the mesh hole of the steel wire is a square of 8㎝x8㎝. During production, a 1.1㎝ diameter is also made at the four corners of the curved galvanized steel wire mesh and at the center of the left and right sides of the two curved sides at 50㎝. holes, a total of 6 holes. The construction height of the whole "vertical pole" is generally 25m to 30m, and the construction procedure is as follows:
[0031] (1) First of all, locate the construction position of the first vertical pole planting belt. On the 60cm wide construction line of the "vertical pole", use a hammer to chisel the uneven stones as much as possible, and some ditches that are too deep The place also needs to lay stones and reinforce it with concrete to facilitate the installation of...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com