Unlock instant, AI-driven research and patent intelligence for your innovation.

A Master-Slave Clock Synchronization Method for the Background Flow of Smart Substation Maintenance Business Information

A technology for smart substations and maintenance services, applied in electrical components, multiplexed communications, and time-division multiplexed systems, etc., can solve problems affecting master-slave clock synchronization accuracy and error optimization, and large synchronization errors

Active Publication Date: 2018-02-02
STATE GRID CORP OF CHINA +2
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] However, due to the irresistible interference factors in the communication network of the smart meter power station, the end-to-end path delay jitter occurs when the master clock and the slave clock are synchronized, which seriously affects the synchronization accuracy and error optimization of the master-slave clock. This may cause a large synchronization error caused by the end-to-end delay jitter of the master-slave clock in the actual substation synchronization process, which seriously affects the safe and reliable operation of the smart substation.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • A Master-Slave Clock Synchronization Method for the Background Flow of Smart Substation Maintenance Business Information
  • A Master-Slave Clock Synchronization Method for the Background Flow of Smart Substation Maintenance Business Information
  • A Master-Slave Clock Synchronization Method for the Background Flow of Smart Substation Maintenance Business Information

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0028] Such as figure 1 Shown is the method flowchart of the present invention, below in conjunction with specific embodiment the method of the present invention is further described:

[0029] The master-slave clock synchronization method of the intelligent substation maintenance business information background flow provided by the present invention is aimed at an intelligent substation using the IEEE 1588 time synchronization standard for master-slave clock synchronization, including the following steps:

[0030] S1. Continuous sampling to obtain the delay value of the master-slave clock background flow in the substation to form the delay time sequence {delay(i)} of the master-slave clock;

[0031] Assuming that it is currently the kth synchronization cycle, start to collect delay value data for a certain time I (such as 3 to 5 cycles) before the current synchronization cycle, and take T as the collection cycle, and the master clock terminal device records data from the slave...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a master-slave clock synchronization method of the maintenance service class information background flow of an intelligent substation. The master-slave clock synchronization method includes the following steps that: the master-slave clock background flow delay values of the substation are continuously sampled, so that a master-slave clock delay time sequence is obtained; a probability confidence interval method is adopted to select abnormal values from master-slave clock delay time; a median substitution method is adopted to replace the abnormal values, so that a master-slave clock delay time sequence can be reconstructed; an exponential delay model is adopted to calculate the optimal estimated values of the end delay of a master clock end and a slave clock end; and the optimal estimated values are adopted to correct the delay of the master clock and the slave clock. With the method of the invention adopted, deviation rules of the end background flow delay jitter deviation of the master clock end and the slave clock end are calculated, so that the optimal estimated values of the end delay of the master clock end and the slave clock end can be realized, and therefore, the synchronization stability of the master clock and the slave clock can be improved. With the method adopted, the synchronization error of the intelligent substation can be decreased, and the synchronization accuracy of the intelligent substation can be improved.

Description

technical field [0001] The invention specifically relates to a master-slave clock synchronization method for the background flow of maintenance business information in an intelligent substation. Background technique [0002] With the development of national economy and technology and the improvement of people's living standards, smart grid has been formed. [0003] The smart substation is the supporting node of the smart grid and one of the important supporting contents of the Energy Internet. An important technical standard for smart substations is the IEC61850 standard, which provides a good solution for communication between primary and secondary equipment and between secondary equipment in substations. In the framework of the IEC61850 standard, the IEEE 1588 time synchronization standard (hereinafter referred to as the 1588 standard) is the key to ensuring the intelligence of the substation. The accuracy of the synchronization clock will directly affect the control accu...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Patents(China)
IPC IPC(8): H04J3/06
CPCH04J3/0667
Inventor 徐志强陆俊伍晓平肖振锋陈剑周舟邓哲
Owner STATE GRID CORP OF CHINA