Mounting process of extra-large truss of cross-spherical bin
An installation process and truss technology, applied in the installation field of spherical silo and its auxiliary steel structure, can solve the problems of insufficient safety, high cost, low installation efficiency, etc., and achieve the effect of saving cost, improving efficiency and avoiding the influence of cross-construction.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Examples
Embodiment Construction
[0021] The present invention will be further described below in conjunction with specific embodiment:
[0022] Taking the on-site construction conditions of the first phase of the China Power Investment Coal Wharf Project in Yancheng Port Binhai Port Area as an example, the installation process of the super-large truss spanning the spherical warehouse is introduced. The specific steps are as follows:
[0023] (1) Segmentation of truss and ground assembly
[0024] According to the truss structure diagram, the relative position of the outer truss column of the spherical warehouse and the relative position of the central column in the warehouse, the truss is divided into the inner truss section and the upper truss section of the warehouse wall; when the truss is divided into the inner truss section and the upper truss section of the warehouse wall Two requirements: the location of splitting is to choose the truss node close to the warehouse wall in the spherical warehouse, and at...