Construction method of embedded pipe in concrete cut-off wall based on detachable straightening device
A technology of concrete cut-off walls and pre-embedded pipes, which is applied in foundation structure engineering, sheet pile walls, buildings, etc., to achieve the effects of reducing deformation, saving costs, and increasing rigidity
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0040] This embodiment includes the following steps:
[0041] Step 1) Move the entire adjustable device, position, and rotate the adjustable lifting support 5 so that the first to fourth layers of the upper part of the device are horizontal, because the first layer of horizontal plane 1, the second layer of horizontal plane 2, the third layer of horizontal plane 3, The fourth horizontal planes 4 are parallel to each other, so when the first horizontal plane 1 of the device is horizontal, the other planes are also horizontal. Through this leveling, the four passing holes at the same position on the four horizontal planes must be on a vertical line, so as to ensure that the inserted embedded pipes are all vertical, and the connection of the two layers of embedded pipes must also be in a vertical line. online, thereby greatly reducing the tilt and tilt accumulation caused by the crane hoisting process, and the operation is convenient, such as Figure 1~4 shown.
[0042] Step 2)...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


