Filling inspection mechanism
A testing mechanism and filling technology, applied in packaging, packaging protection, transportation and packaging, etc., can solve the problems of labor-intensive inspection, insufficient filling volume, etc., and achieve the effect of ensuring product quality, enhancing flexibility, and employing fewer people.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0054] like Figures 1 to 3 As shown, the filling detection mechanism is provided with a rotating shaft 4, and the driving device of the filling machine drives the rotating shaft 4 to reciprocate, and drives the positioning member 3 to swing through the angular range of the reciprocating rotation. The linkage 2 is sleeved on the rotating shaft 4 through the provided rotating hole, so that the linkage 2 can rotate relative to the rotating shaft 4 and is not driven by the rotation of the rotating shaft 4 itself, but only moves under the driving of the positioning member 3 .
[0055] Driven by the rotating shaft 4, the moving route of the driving member 3.1 on the positioning member 3 is arc-shaped. The swinging positioning member 3 pushes the linkage member 2 to swing on the rotating shaft 4 through the driving member 3.1.
[0056] It can be understood that the installation method of the positioning member 3 and the linkage member 2 and the rotating shaft 4 can be one of the fo...
Embodiment 2
[0060] like Figures 4 to 5 As shown, the filling detection mechanism is provided with a track 5 on which the linkage member 2 and the positioning member 3 are slidably installed.
[0061] The positioning member 3 is directly pushed and pulled back and forth by driving the cylinder 6 to make it slide back and forth on the track 5 . Or through the drive wheel 7.1 driven by the drive motor 7, the drive wheel 7.1 pushes and pulls the positioning member 3 reciprocally through the eccentrically installed drive link 7.2, so that it slides back and forth on the track 5.
[0062] It can be understood that the installation method of the positioning member 3 and the linkage member 2 and the track 5 can be one of the following methods:
[0063] like Figure 4 As shown, one is that the positioning member 3 and the linkage member 2 are installed on the same track 5, and the positioning member 3 and the linkage member 2 move in parallel and synchronously slide.
[0064] like Figure 5 A...