Water flow time lag processing method for cascade reservoir short-term optimal scheduling
A technology for optimizing scheduling and cascading reservoirs, applied in data processing applications, instruments, forecasting, etc., to achieve broad application prospects, mature technology, and good portability
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0031] The present invention will be described in further detail below in conjunction with the accompanying drawings.
[0032] In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, but not to limit the present invention.
[0033] The present invention takes the cascade reservoir of the Jinguan power supply group in the Yalong River Basin of my country as an example, uses the proposed method to derive the time-delayed functional operator of the water flow, and applies it to the daily optimal dispatching process of the cascade reservoir. The calculation results show that, The time lag processing method proposed by the present invention is almost the same as the actual operating conditions, and has ...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com