Excavation tunnel construction method
A technology for tunnel construction and tunneling, which is applied in tunnels, tunnel linings, earthwork drilling and mining, etc. It can solve problems such as differences in construction techniques and technologies, construction difficulties, etc., and achieve good construction effects, ensure excavation stability, and construction efficiency fast effect
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2018-08-28
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the technical field of tunnel construction, in particular to an excavated tunnel construction method. Background technique
[0002] After the 1990s, many cities in our country began to launch subway projects, and began to introduce and apply international advanced shield construction technology and equipment on a large scale. The subway projects were rapidly constructed in some cities, and the ground subsidence technology covered by them developed accordingly. my country's application of the shield method to build tunnels began in Shanghai in the 1950s and 1960s. With the in-depth research of shield tunneling method and the increase of engineering applications, the construction technology of shield tunneling method has been developed and improved. In recent years, shield tunneling technology has made significant progress. There are also differences in the mastery of the construction techniques and technologies of different me...
Examples
Embodiment Construction
[0038] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0039] In an embodiment of the present invention, a construction method of an unearthed tunnel is described. The excavated tunnel is constructed by the CD method, with a total length of 37.7m. Each pilot tunnel is constructed by the step method, and the core soil is reserved for circular excavation. The length of the step is not less than 5m. see figure 1 The flow chart of the excavated tunnel construction process is shown.