A rapid construction method of T-beams in the shed opening of the upper-span business line in a narrow space

A technology of narrow space and construction method, applied in the direction of construction, protective equipment, etc., can solve the problems of T-beam hoisting operation obstruction, slow construction progress, increased rental costs, etc., to solve the shortage of prefabricated sites, reduce the overall weight, and avoid multiple The effect of the second please click
CN108589568BActive Publication Date: 2020-03-27THE SECOND CONSTR OF CTCE GROUP +1

Patent Information

Authority / Receiving Office
CN · China
Patent Type
Patents(China)
Current Assignee / Owner
THE SECOND CONSTR OF CTCE GROUP
Publication Date
2020-03-27

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The invention discloses a quick construction method for an over-crossing business line hangar tunnel T-shaped girder in narrow space. The quick construction method includes the following steps that ahangar tunnel foundation pit is dug according to a designed location and a hangar tunnel stand column is constructed; a hangar tunnel vertical girder is constructed, a bracket support is pre-buried and a gantry crane walking railway is set up on the bracket support; a distributive girder and a form board are laid on the top of the hangar tunnel vertical girder to be used as a T-shaped girder primary prefabricating platform, and a gantry crane is arranged on the gantry crane walking railway; a T-shaped girder is poured on the T-shaped girder primary prefabricating platform and hoisted to a vacant zone; if the vacant zone can not be laid fully, then the step is conducted repeatedly; the T-shaped girder primary prefabricating platform is demolished, and the form board is laid on the T-shapedgirder to be used as a T-shaped girder secondary prefabricating platform; a T-shaped girder is poured on the T-shaped girder secondary prefabricating platform and hoisted to a vacant zone and erectingof the T-shaped girder is completed; the T-shaped girder secondary prefabricating platform is demolished and auxiliary facilities are exerted; and other unnecessary facilities are demolished. The problem of insufficient prefabricating places can be solved and the risk of the hoisting operation near the business line is avoided.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention relates to a rapid construction method of a T-shaped beam spanning a business line shed hole in a narrow space. Background technique

[0002] In the process of railway construction in the southwestern mountainous area, it is inevitable to encounter landforms along rivers and mountains, and a large number of high slopes and steep cliffs have been produced during the construction process. With the passage of time, many slope structure reinforcement measures built in the early years have gradually failed, and the weathering of the rock mass on the slope surface has become increasingly serious, and the stability has deteriorated. , affecting the driving safety of the business line.

[0003] Building a new protective shed on the business line is an effective measure to control the slope of the tunnel entrance and exit and the dangerous rockfall on the side slope of the high cutting. The construction of the shed hole is divided into foundatio...

Claims