15results about How to "Improve erection efficiency" patented technology

Photovoltaic bracket suspension support structure

ActiveCN224289696UPerfect for simplicity needsreduce transport volumePhotovoltaic supportsPhotovoltaic energy generationRight triangleAgricultural engineering
This utility model discloses a photovoltaic bracket suspension support structure, mainly comprising triangular support stabilizing units. Each triangular support stabilizing unit consists of two equally sized right-angled triangular supports symmetrically arranged on the left and right sides of a column. The right-angled triangular supports are composed of a column, a crossbeam, and diagonal braces, with the column and crossbeam serving as the right-angled sides and the diagonal braces as the hypotenuses. The two right-angled triangular supports share a single column. This utility model offers advantages such as economy and safety, high construction efficiency, and rapid component installation. It effectively solves problems such as difficulty in installing photovoltaic modules in fish-solar hybrid projects, agricultural-solar hybrid projects, and projects with excessively high ground clearance, which often result in low efficiency, long construction periods, and uneconomical costs.
Owner:CHINA ENERGY ENG GRP GUANGXI ELECTRIC POWER DESIGN INST

Suspension bridge main cable strand erecting method and system

PendingCN121992722AReduced installation freedomCapture changes in internal forces in real timeSuspension bridgeBridge structural detailsArchitectural engineeringStructural engineering
According to the suspension bridge main cable strand erecting method and system, systematized control over erecting of the suspension bridge main cable strand is achieved through the complete processes of cable strand restraining frame installation, double-reference cable strand traction, linear adjustment, stability observation and conventional cable strand erecting. Firstly, the cable strand restraining frames are installed at equal intervals to provide a uniform supporting foundation for the cable strands, it is ensured that loads are distributed reasonably, and the risk of local stress concentration is reduced; the symmetrical arrangement of the double-reference cable strands covers the lower half part area of the main cable, the installation freedom degree of the conventional cable strands is remarkably reduced by adding positioning reference objects, and deviation accumulation caused by insufficient single-reference positioning is avoided; in the stability observation link, the reference state is judged through a preset threshold value, environmental fluctuation interference is eliminated, the long-term reliability of the reference cable strand as a reference is guaranteed, and a solid foundation is laid for subsequent conventional cable strand erection.
Owner:CHINA COMM SECOND PUBLIC OFFICE EAST CHINA CONSTR CO LTD +1

A portable cable erection device for building electromechanical installation

This invention relates to the field of cable laying technology, specifically to a convenient cable laying device for building electromechanical installation, comprising a bracket, a fixed pulley, and a cable, as well as a locking device and a cable management wheel. The fixed pulley is rotatably mounted on the upper front surface of the bracket. A vertically arranged groove is provided on the front front surface of the bracket below the fixed pulley. A slider is fixedly mounted on the rear end of the cable management wheel, and the slider is slidably mounted in the groove. A locking device is installed on the edge of the bracket on one side of the fixed pulley. One end of the cable passes through the fixed pulley and then through the locking device, which locks the cable in place. The other end of the cable passes around the cable management wheel, which is equipped with a tightening device for securing the cable. This invention achieves cable organization and adjustment by using the fixed pulley and cable management wheel. The locking and tightening devices secure the cable to prevent slippage, avoiding sagging at overhead locations, improving laying efficiency, and facilitating subsequent processing.
Owner:WUHAN IRON & STEEL ENG TECH GROUP

Quick positioning and connecting device for floating bridge and pontoon bridge

The utility model relates to a butt joint positioning device for floating bridge modules. A quick positioning and connecting device for a floating bridge and a pontoon bridge is composed of a positioning mechanism and a connecting mechanism, and the positioning mechanism is composed of a positioning rod (108), a positioning baffle (103), a movable clamping rod (106), a buffer spring (105), a steel wire rope (104) and a winch (101); the movable clamping rod (106) is connected with the positioning baffle (103) through the buffer spring (105), the positioning baffle and the winch are fixedly connected with one floating bridge or pontoon bridge unit, and the positioning rod (108) is fixedly connected with the other floating bridge or pontoon bridge unit. One end of the steel wire rope is connected with the winch (101), and the other end of the steel wire rope penetrates through a strip-shaped ring (107) arranged at the front end of the movable clamping rod (106) to be fixed to the positioning baffle (103). According to the connecting structure, accurate positioning of the connecting structure of the pontoon bridge and the pontoon bridge and rapid connection of the pontoon bridge and the pontoon bridge unit can be achieved, the butt joint time of the pontoon bridge and the pontoon bridge is greatly shortened, and the connecting efficiency of the pontoon bridge and the pontoon bridge is improved.
Owner:苏国安

An auxiliary erection tool applied to cable erection

The utility model provides a kind of applied to the auxiliary erecting tool of cable erection, it is related to cable erection technical field, including trolley, the top of trolley is connected with auxiliary lifting assembly, the auxiliary lifting assembly includes two groups of fixed support.The utility model in when erecting scene space is smaller, cannot use lift truck to carry out the erection of cable, cable can be rolled to trolley by uphill board, after then, servo motor is started to drive rotating rod rotation, to make two groups of unidirectional screw rod rotate simultaneously, further by the mode of screw rotation drives cable to ascend, trolley is pushed to the front of target placing rack, after adjusting cable position makes it with placing rack accurate alignment, switch servo motor is positive rotation mode, by positive engagement transmission makes unidirectional screw rod drive hanger steady decline, until cable and placing rack are completely contacted, i.
Owner:HUNAN IND EQUIP INSTALLATION

A safety type utility pole erecting device and method of use

ActiveCN116927576BPrecise erectionStable erection
The application relates to the field of power equipment, in particular to a safe electric pole erecting device which comprises a base, an electric pole containing mechanism, a lifting device, a pushing device, a horizontal pushing device, a pressing device and a pulling device; a groove is arranged on the top surface of the base; the electric pole containing mechanism comprises a fixing mechanism which is arranged on one side of the electric pole containing mechanism close to the pressing device; the lifting device is arranged on the top surface of the base far away from the groove; the pushing device is arranged on the top surface of the base and directly above the first sliding groove; the horizontal pushing device is arranged on one side of the lifting device close to the groove; and the pressing device is fixedly arranged on the top surface of the base and located far away from the lifting device; through cooperation of the electric pole containing mechanism, the pushing device, the lifting device, the horizontal pushing device and the pulling device, the electric pole can be accurately delivered to a designated position; and the top of the electric pole can be pressed downwards by the pressing device, so that the electric pole can be inserted into the soil.
Owner:FOSHAN POWER SUPPLY BUREAU GUANGDONG POWER GRID +1

Tensile cable and processing method thereof

PendingCN121847690AImprove erection efficiencyElectric cablesWire wrap
The invention relates to the technical field of cable straightening, in particular to a tensile cable and a processing method thereof, and the method comprises the following steps: 1, installing a cable winding roller in a fixing device; 2, the cable is pulled out from the winding roller and penetrates through the two extrusion rollers located at the lower end and the extrusion roller located at the upper end; thirdly, the straightening device continuously pulls the cable out of the winding roller and straightens the cable; 4, the straightened cable is erected, a straightening device comprises a rack, two supports I are fixedly connected to the rack, two sliding rails are fixedly connected between the two supports I, two sliding blocks I are slidably connected to the two sliding rails, a sliding table is fixedly connected to the upper ends of the four sliding blocks I, and the sliding table is fixedly connected to the lower ends of the four sliding blocks I; the cable straightening device has the beneficial effects that the cable is straightened when being pulled out from the cable roller, and the cable erecting efficiency is further improved.
Owner:何北池

A pumped storage power station water surface floating bridge erection system

ActiveCN115652806BImprove erection efficiencyAchieve automatic delegationWater-power plantsHydro energy generationPower stationArchitectural engineering
This invention discloses a floating bridge erection system for pumped storage power stations, relating to the technical field of floating bridge erection equipment for pumped storage power stations. The technical solution includes a fixed platform on the ground, a bridge plate storage rack fixedly mounted on the upper middle part of one side of the fixed platform, a support platform fixedly mounted on the middle part of one side of the fixed platform, and a conveyor rail positioned below the support platform. The interior of the bridge plate storage rack matches the side wall of the bridge plate, and the bridge plate is slidably connected to the conveyor rail. The beneficial effects of this invention are: the bridge plates are lowered sequentially through a supporting mechanism; after the bridge plate falls onto the conveyor rail, it is pushed by a pusher plate, then pressed down by a pressure plate, and then the next bridge plate is lowered, and the two bridge plates are spliced ​​together. This achieves automatic lowering of the bridge plates and overlapping between adjacent bridge plates, saving a significant amount of manual labor, improving the efficiency of floating bridge erection, and avoiding safety risks.
Owner:STATE GRID XINYUAN +1

Ship deck lower scaffold device and laying and disassembling method thereof

The invention discloses a ship deck lower scaffold device and a laying and disassembling method thereof, and belongs to the technical field of ship scaffolds. According to the device, a bulkhead pre-welding scaffold eye plate and a deck lower pre-welding scaffold hook serve as stress foundations, a scaffold horse, a steel pipe jig capable of being customized and spliced and an inclined hanging chain are connected through bolts to form a tension brace structure, only basic parts are welded, and no open fire operation exists in the whole process. Laying follows the principle from the two sides to the middle, disassembling is carried out according to the principle of later building and first disassembling and from the middle to the two sides, and during disassembling, head jacking operation can be carried out, and safety fulcrums are arranged. Welding damage is small, cabin adaptability is high, erection and disassembly are safe and efficient, components and accessories can be recycled, and the device is suitable for narrow closed cabins such as methanol cabins with high coating requirements.
Owner:DALIAN COSCO KHI SHIP ENG

Road culvert construction formwork

The application relates to the technical field of road culvert structures, improves the low construction efficiency of the prior art, and discloses a road culvert construction formwork, which comprises a plurality of longitudinal connecting rods, a plurality of cross ribs and a plurality of arch ribs, the two ends of the arch ribs are provided with connecting sleeves, the longitudinal connecting rod comprises a connecting head and a plurality of supporting sleeves, the connecting head is arranged in the connecting sleeve, the longitudinal connecting rod is provided with a first limiting assembly capable of limiting the connecting sleeve from separating from the connecting head, the plurality of supporting sleeves are arrayed on the longitudinal connecting rod, a cross rod is arranged in the corresponding supporting sleeve, the longitudinal connecting rod is provided with a second limiting assembly capable of limiting the cross rod from separating from the supporting sleeve, the longitudinal connecting rod is provided with a linkage used for simultaneously driving the first limiting assembly and the second limiting assembly to move, and the arch rib is provided with a hanging sleeve used for arranging the cross rib. The application can provide a formwork structure convenient to connect and fix and increase the erection efficiency of the formwork.
Owner:FUJIAN HUAHANG CONSTR GRP CO LTD

Quick positioning and connecting device for floating bridge and pontoon bridge

The invention relates to a butt joint positioning device for floating bridge modules. A quick positioning and connecting device for a floating bridge and a pontoon bridge is composed of a positioning mechanism and a connecting mechanism, and the positioning mechanism is composed of a positioning rod (108), a positioning baffle (103), a movable clamping rod (106), a buffer spring (105), a steel wire rope (104) and a winch (101); the movable clamping rod (106) is connected with the positioning baffle (103) through the buffer spring (105), the positioning baffle and the winch are fixedly connected with one floating bridge or pontoon bridge unit, and the positioning rod (108) is fixedly connected with the other floating bridge or pontoon bridge unit. One end of the steel wire rope is connected with the winch (101), and the other end of the steel wire rope penetrates through a strip-shaped ring (107) arranged at the front end of the movable clamping rod (106) to be fixed to the positioning baffle (103). Precise positioning of the pontoon bridge and pontoon bridge connecting structure and rapid connection of the pontoon bridge and pontoon bridge units can be achieved, the butt joint time of two modules of the pontoon bridge and the pontoon bridge is greatly shortened, and the connecting efficiency of the pontoon bridge and the pontoon bridge is improved.
Owner:苏国安

An insulator for overhead power transmission and distribution lines

This utility model relates to the field of insulator technology, specifically an insulator for overhead power transmission and distribution lines, comprising: an insulator body, an insulator platform fixedly mounted on the upper end of the insulator body, a cover plate rotatably mounted on the mounting platform, and a fixing component and an auxiliary component mounted on the mounting platform for mounting the power transmission and distribution line body; by inserting the power transmission and distribution line body into the mounting groove and placing it on the arc surface of the arc-shaped pad, rotating the cover plate to press the power transmission and distribution line body so that the power transmission and distribution line body fits against the anti-slip ridges on the arc surface of the arc-shaped pad, while the rotating column and the lever plate are inserted into the straight groove, and then rotating the lever plate causes the lever plate to engage with the protruding plate to limit the cover plate, the compressed spring returns to its original position and pushes the limit plate to move, causing the positioning plate to move upward so that its end wall engages with the rotating plate, thereby fixing the position of the lever plate and realizing the stable mounting of the power transmission and distribution line body on the insulator body for overhead power transmission and distribution lines. The operation is simple and quick, without the need for auxiliary tools, thus improving the efficiency of power transmission and distribution line erection.
Owner:PINGDINGSHAN INSULATING PROD LTD CO

A segmental assembly type variable cross-section box girder cantilever crane and hoisting method

The present application relates to a kind of slice assembly type variable cross-section box girder cantilever crane and hoisting method, crane includes support system, walking system and hoisting system;Walking system includes two tracks beams anchored in the beam surface two sides, the support system includes two diamond truss pieces, the lower longitudinal beam of two truss pieces is temporarily anchored on track beam, hoisting system includes two mobile cross beams, two mobile cross beams are supported on the upper longitudinal beam of two support pieces and can slide along the upper longitudinal beam, two mobile cross beams are respectively equipped with two winches that can slide along mobile cross beam.By hoisting system hoisting the each board unit of box girder section and splicing into complete section, after one section hoisting is completed, support system moves forward and hoists next section.The crane structure of the present application is simple, small in size, light in weight, and has good applicability for slice assembly type box girder section assembly.
Owner:ROAD & BRIDGE INT CO LTD

Electromechanical installation engineering cable cutting device

ActiveCN224273106UEasy to weldImprove erection efficiencyTool bitStructural engineering
This utility model discloses a cable cutting device for electromechanical installation engineering, including a workbench. A base is provided at the bottom of the workbench, and a first support plate is provided on the upper surface of the workbench. A lifting cylinder is provided on the top of the first support plate, and a first limiting post is provided at the output end of the lifting cylinder. A transmission rod is provided on the side of the first limiting post, and a first cutting head is provided at the bottom of the transmission rod. Two support seats corresponding to the first cutting head are provided on the upper surface of the workbench. An arc-shaped groove is formed on the top of each support seat, and tensioning components are provided on both sides of each support seat. This application includes a first cutting head and a second cutting head. The first cutting head can cut the cable, and the second cutting head simultaneously cuts the cable outer shell, separating the cable outer shell from the main cable at the cable connection point. This facilitates subsequent cable splicing and improves the efficiency of cable laying.
Owner:DALIAN WEIDA CONSTR ENG CO LTD

Disclosed is a disc buckle type scaffold.

ActiveCN224413067UImprove the uniformity of forceIncreased durabilityClassical mechanicsStructural engineering
The application belongs to the technical field of scaffolds, and particularly relates to a disc buckle type scaffold. The overall structure at the two ends of the horizontal rod is arranged at the upper end of the connecting disc, the unilateral stress concentration problem caused by the fact that the construction load directly acts on the local area of the connecting disc in the traditional scaffold is changed, and therefore the stress uniformity and structural durability of the connecting disc are effectively improved. The end of the horizontal rod is provided with a mounting portion with a locking hole, the locking hole can be matched with the locking area on the vertical rod, the displacement or rotation of the horizontal rod in the use process is effectively limited, and the stable connection between the horizontal rod and the vertical rod is realized. In addition, at least one group of horizontal rods which are arranged perpendicularly to each other in the horizontal plane are connected on the same vertical rod, the vertical rod can form a spatial stable structure with at least two surrounding vertical rods through the structural design, the overall structural stability requirement can be met without being connected with all the vertical rods in four directions, the safety is ensured, and the installation and dismounting efficiency of the scaffold is significantly improved.
Owner:ZHEJIANG CONSTR ENG GRP CO LTD