The invention discloses an ALC partition board and pipeline integrated construction method. The method comprises the steps of deepened design, drawing, ALC partition board production, structural pipeline pre-burying, ALC partition board field installation and inspection and acceptance. According to the deepening design, BIM technology
integrated design is adopted, and building structure model deepening, hardcover
tail end point deepening, electromechanical pipeline pre-burying deepening, ALC partition wall board deepening and structure formwork deepening are conducted in a unified mode; the drawing is that an ALC partition board
production drawing, a structure mold matching drawing and an electromechanical reserved embedded drawing are formed after deepened design and integration; according to production of the ALC partition wall board, high-temperature-resistant line pipes and line boxes are fixed to a partition wall board reinforcing mesh in an auxiliary mode through fixing pieces according to a
production drawing, and the high-temperature-resistant line pipes and the line boxes and the partition wall board are poured together to form a whole. The structural pipeline pre-burying is that line pipes are pre-buried according to the position of a deepening graph during structural construction; according to field installation of the ALC partition wall board, rapid and accurate positioning is conducted through a board erecting
machine and a pulling
rope according to a
layout map, line pipes in the board and structural pre-embedded line pipes are rapidly connected, and fixing is conducted after correction.