Patents
Literature
Hiro is an intelligent assistant for R&D personnel, combined with Patent DNA, to facilitate innovative research.
Hiro

38results about How to "Realize the erection" patented technology

Full-automatic log periodic antenna

The invention discloses a full-automatic log periodic antenna. The full-automatic log periodic antenna is capable of meeting high mobility requirement, fixing requirement or the like application requirements. The full-automatic log periodic antenna takes full advantages of the lifting function of an antenna mast, a soft line oscillator and an automatic line winder for winding and storing the soft line oscillator to full automatically mount, wind and store antenna. The full-automatic log periodic antenna realizes to full automatically switch the antenna working states without manual operation; the full-automatic log periodic antenna is easy to highly and organically integrate with a carrying platform, the platform shape is rarely influenced, and the cross-country mobility of a carrying tool is not influenced; the full-automatic log periodic antenna can adapt to the application requirements of different special fields and greatly improve the quick response ability of the system.
Owner:36TH RES INST OF CETC

Integral steel bar mesh frame, prefabricated plate containing same, and connecting structure of prefabricated plate

The invention discloses an integral steel bar mesh frame, a prefabricated plate containing the same, and a connecting structure of the prefabricated plate. The integral steel bar mesh frame comprises an upper layer steel bar mesh sheet, a lower layer steel bar mesh sheet and a triangular supporting mesh sheet, the upper layer steel bar mesh sheet comprises upper layer transverse ribs and upper layer longitudinal ribs, the lower layer steel bar mesh sheet comprises lower layer transverse ribs and lower layer longitudinal ribs, triangular supporting mesh sheet ribs are arranged between the upper layer longitudinal ribs and the lower layer longitudinal ribs, the triangular supporting mesh sheet ribs are welded to the upper layer longitudinal ribs and the lower layer longitudinal rib, the triangular supporting mesh sheet ribs comprise a plurality of short steel bars with the two ends being provided with bent hooks, the short steel bars are mutually connected end to end to form a triangular structure, and the bent hooks of all the short steel bars are hung on the upper layer longitudinal ribs and the lower layer longitudinal ribs correspondingly. Through arrangement of the bent hooks, the triangular supporting mesh sheet ribs are mutually engaged with the upper layer longitudinal ribs and the lower layer longitudinal ribs, and the seismic resistance of the integral steel bar mesh frame and the prefabricated plate with the integral steel bar mesh frame as a skeleton is improved.
Owner:李藏柱

Ceramic tile laying structure and laying method thereof

The invention relates to a ceramic tile laying structure. The ceramic tile laying structure comprises a plurality of fixing strips, each fixing strip comprises a plurality of connecting strips, a decorative plate is placed between every two adjacent fixing strips, each decorative plate comprises a plurality of ceramic tile plates, the back face of each ceramic tile plate is detachably connected to a connecting plate, a supporting rod is fixedly arranged in the middle of each connecting plate, and the end, away from the corresponding connecting plate, of each supporting rod is used for being supported on a ground base layer; connecting rods are arranged on the two sides of each supporting rod, a mounting rod is arranged at the end, away from the corresponding supporting rod, of each connecting rod, a first mounting block is arranged on each mounting rod, and a first mounting groove is formed in each connecting strip; and each supporting rod is provided with a driving mechanism used for simultaneously driving the connecting rods on the two sides so as to drive the first mounting block to move into or out of the corresponding first mounting groove. The ceramic tile laying structure and the laying method thereof have the advantages that ceramic tiles can be conveniently erected, and the ceramic tile erecting efficiency can be improved.
Owner:变形积木(北京)科技有限公司

Cable crossing device for power construction

The invention discloses a cable crossing device for power construction. The device comprises a transport vehicle, a support frame and a mounting table are mounted on the transport vehicle, wherein a lifting mechanism is mounted on the mounting table, a support mechanism is mounted at the top of the lifting mechanism, and a first connecting rod and a second connecting rod are mounted on the liftingmechanism; one ends of the first connecting rod and the second connecting rod are installed on the lifting mechanism, and the other ends are installed on the supporting mechanism. The device only needs to be moved to a working position under the action of a transport vehicle, assembling and disassembling are not needed, the working efficiency is greatly improved, the lifting mechanism can expandthe supporting mechanism, the purpose of crossing obstacles is achieved, erecting of cables is achieved, the lifting mechanism can fold the supporting mechanism, and the device is convenient to use and high in practicability; safety of the device in the transportation process is guaranteed, the stability of the device is guaranteed through the arrangement of the two supporting mechanisms, the situation that the device inclines and even is damaged due to uneven stress in the working process is prevented, and the service life of the device is greatly guaranteed.
Owner:STATE GRID SHANDONG ELECTRIC POWER CO QIHE POWER SUPPLY CO

Building prefabricated part mold with replaceable locking

The invention discloses a building prefabricated part mold with replaceable locking. The building prefabricated part mold comprises vertical rods. The two vertical rods of any side are provided with an inserting rod and a casing pipe in the same horizontal direction respectively. First tightening screws are arranged at the positions, close to the sleeving connection positions with the inserting rods, of the casing pipes. Detachable mold stopping blocks are inserted into the corresponding vertical rods. The mold stopping blocks are provided with stopping block vertical rods capable of being inserted into the corresponding vertical rods. The stopping block vertical rods are provided with L-shaped baffles which are clamped onto the opening positions of the vertical rods. Supporting rods are arranged at the upper ends of the vertical rods respectively. Steel channels are formed between the upper portions of the supporting rods on the two opposite sides, and openings of the two steel channels are opposite. A sliding adjustment lever is arranged between the openings of the steel channels. A sliding part is arranged on the adjustment lever in a sleeving connection mode. A through second tightening screw is formed in the upper portion of the sliding part. A hanger hook is arranged on the lower portion of the sliding part. By means of the building prefabricated part mold with replaceable locking, the defects in the prior art are overcome, the structure is reasonable, operation is convenient and fast, locking and fixing can be facilitated and hangers can be installed in an adjustablemode.
Owner:江苏砼鑫重工机械有限公司

Method for installing spatial-bending-joint discontinuous tubular truss

InactiveCN109138448ARealize the erectionRealize integrated hoistingGirdersJoistsBending jointBuilding construction
The invention discloses a method for installing a spatial-bending-joint discontinuous tubular truss. The method comprises: step one, steel plates are laid at a construction site and an assembling platform is built; step two, spatial coordinate values of nodes 1,2,3,4,5,6,7, and 8 of a front pipe truss and a rear pipe truss are calculated and the nodes 1,2, and 3 among the opposite nodes of the front pipe truss and the rear pipe truss form a reference surface; step three, altitude differences of the nodes 4, 5, 6, 7, and 8 relative to the reference surface and horizontal relative coordinates ofthe nodes are calculated based on the reference surface, and relative heights of all support columns in a front bed jig and a rear bed jig on the assembling platform are determined according to the relative coordinates of all nodes and the reference surface; step four, front and rear pipe truss assembling, welding and correction are carried out on support columns of the front bed jig and the rearbed jig respectively; and the front pipe truss and the rear pipe truss are fixedly connected by profile steel members; step five, overall hoisting, installation preparation, and welding are carried out on the front pipe truss and the rear pipe truss; and step six, the profile steel members are removed. Therefore, the construction quality and construction safety are ensured; the construction schedule and installation precision are improved; and the construction cost is lowered.
Owner:FANGCHENGGANG ZHONGYI HEAVY IND

Double self-elevating external climbing frame of super high-rise building

The invention relates to building auxiliary equipment, in particular to a double self-elevating external climbing frame of a super high-rise building. The external climbing frame comprises frame bottom I-shaped steel and vertical I-shaped steel; through holes are formed in the centers of the groove surfaces of the frame bottom I-shaped steel; connecting rectangular grooves are formed in the top ends of the frame bottom I-shaped steel; connecting discs are fixed on the side surfaces of the frame bottom I-shaped steel; connecting screw holes and mounting screw holes are symmetrically formed in the side faces of the connecting discs; a connecting rod is connected between the two sets of frame bottom I-shaped steel; connecting threads are symmetrically arranged at the two ends of the side wallof the connecting rod; connecting arc plates are fixed to the bottom ends of the vertical I-shaped steel; penetrating screw holes are formed in the side faces of the connecting arc plates; threaded penetrating holes are formed in the centers of the side faces of the vertical I-shaped steel; a plurality of sets of horizontal parts are arranged between the vertical I-shaped steel; bottom supportingparts are arranged between the bottommost horizontal part and the frame bottom I-shaped steel; auxiliary supporting parts are arranged between the horizontal parts; a scaffold board is laid above thehorizontal parts; a side fixing part and an inner fixing part are installed on the outer groove face of the vertical I-shaped steel at one side; and a protective side plate is arranged between the side fixing part and the inner fixing part.
Owner:厦门安科科技有限公司

A double self-elevating external climbing frame for super high-rise buildings

The invention relates to a double self-elevating external climbing frame for a super high-rise building, which is a building auxiliary equipment, which includes a frame bottom I-beam and a vertical I-beam. There is a connecting moment groove on the top of the beam, and a connecting disc is fixed on the side of the I-beam at the bottom of the frame. The side of the connecting disc is provided with a connecting screw hole and an installation screw hole. There are connecting rods between the two groups of I-beams at the bottom of the frame. The two ends of the side wall of the connecting rod are symmetrically provided with connecting threads, the bottom end of the vertical I-beam is fixed with a connecting arc plate, the side of the connecting arc plate is provided with a through screw hole, and the center of the side of the vertical I-beam is provided with a threaded hole. There are multiple sets of horizontal pieces between the beams. There is a bottom support piece between the bottom horizontal piece and the I-beam at the bottom of the frame. Auxiliary support pieces are set between the horizontal pieces. Scaffolding boards are laid above the horizontal piece. A side fixture and an inner fixture are installed on the outer groove surface of the vertical I-beam, and a protective side plate is installed between the side fixture and the inner fixture.
Owner:厦门安科科技有限公司

A method for erecting main cables of a suspension bridge with tunnel-type anchorages on both sides

The invention belongs to the technical field of suspension bridge construction, and in particular relates to a method for erecting a main cable of a suspension bridge with tunnel-type anchorage on both sides, comprising the following steps: the anchor head of the main cable is connected to traction equipment, and the traction equipment pulls it to the anchorage gantry on bank A , the anchor head of the main cable is detached from the traction equipment; the anchor head of the main cable after detachment is pulled from the anchorage gantry of Bank A to the front anchor surface of Bank B by the main cable traction equipment; Equipment: The anchor head at the end of the main cable after being separated is pulled to the main cable anchorage point on the anchor surface in front of A bank by the traction equipment in the anchor room, and the anchor head at the end of the main cable is separated from the traction equipment in the anchor room; The anchor head at the end of the main cable of the indoor traction equipment is connected to the anchor point of the main cable to complete the installation of the main cable; it solves the problem that the traditional main cable traction system in the tunnel anchorage on both sides of the strait cannot fully cover the main cable, and realizes the The full coverage of the main cable in the tunnel anchorage meets the needs of the main cable installation, and the method is simple and easy to operate.
Owner:CCCC SHEC SECOND ENG

Power and cooling system and method based on supercritical fluid

The invention relates to a power and cooling system and method based on supercritical fluid, the system is composed of a supercritical carbon dioxide source, a booster pump, a motor, a module control valve, a reversing valve, a double-acting hydraulic cylinder and a radar front end which are tightly connected in sequence, and a working medium flowing among all parts in the system is supercritical carbon dioxide. The system has two working modes including a power mode and a cooling mode, when the system works in the power mode, the module control valve is communicated with the reversing valve, supercritical carbon dioxide enters the double-acting hydraulic cylinder to push the double-acting hydraulic cylinder to stretch out or retract, and the front end of the radar is erected or retracted. In the cooling mode, the module control valve is communicated with the front end of the radar, and supercritical carbon dioxide enters the front end of the radar to achieve cooling. According to the system, supercritical carbon dioxide serves as a medium, a hydraulic lifting system and a liquid cooling system are integrated, the structure is simple, and the maneuvering performance of the elevated maneuvering radar is improved.
Owner:CNGC INST NO 206 OF CHINA ARMS IND GRP

Bridge erecting machine for small-curve railway box girder

The invention belongs to erecting equipment for railway box girders, and in particular relates to a bridge erecting machine for a small-curve railway box girder, which solves the problem that the conventional bridge erecting machine cannot meet the requirement of the erection of the small-curve railway box girder. The bridge erecting machine for the small-curve railway box girder comprises a box-shaped girder which is arranged on a front outrigger, an auxiliary outrigger and a back outrigger, wherein the bottom of the back outrigger supports on back outrigger trolleys; the fronting end of the box-shaped girder is connected with a cantilever beam; both sides of the width of the cantilever beam are provided with longitudinal overhead rails; a cantilever crane is arranged on the longitudinal overhead rails; the cantilever crane comprises a longitudinal movement mechanism and a horizontal movement mechanism; the horizontal movement mechanism comprises a horizontal movement rail frame; a bogie is arranged on the horizontal movement rail frame, and the horizontal movement quantity of the bogie is delta= SL / R; the back outrigger and the auxiliary outrigger are provided with a vertical hinge mechanism; and the two back outrigger trolleys are provided with differential mechanisms. The bridge erecting machine has the advantage that a wide structure of the horizontal movement mechanism of the cantilever beam is matched with the vertical hinge mechanism of the back outrigger and the auxiliary outrigger and the differential mechanisms of the two back outrigger trolleys to realize the erection of the small-curve box girder with a 500-meter curvature radius.
Owner:QINHUANGDAO TIANYE TOLIAN HEAVY INDUSTRY CO LTD +1

Half-through type longitudinal partitioning prefabricated box girder

The invention discloses a half-through type longitudinal partitioning prefabricated box girder. The Z-shaped longitudinal beam A and the Z-shaped longitudinal beam B are oppositely arranged; sedimentation steps are arranged at the two ends of the Z-shaped longitudinal beam A and the Z-shaped longitudinal beam B; the two ends of the Z-shaped longitudinal beam A and the two ends of the Z-shaped longitudinal beam B are connected through end cross beams. The bottoms of the Z-shaped longitudinal beam A and the Z-shaped longitudinal beam B located between the cross beams at the two ends are connected through a bottom plate wet joint, the composite slabs are mutually assembled on steps on the upper portions of the Z-shaped longitudinal beam A and the Z-shaped longitudinal beam B, and the top plate post-pouring layer is poured on an upper cavity formed by the Z-shaped longitudinal beam A, the Z-shaped longitudinal beam B and the composite slabs. The beneficial effects of the invention are that: the method is suitable for large-scale production; implementing factory batch prefabrication, according to the method, the construction cost is reduced, a small part of operation sites are manufactured, the construction efficiency is improved, the labor environment of workers is improved, the influence on municipal road traffic interference and urban environment dust and noise pollution is reduced, the requirement for transportation and installation equipment is low, the requirement for site conditions and line conditions is low, and therefore the method can be flexibly applied to an urban elevated section structure.
Owner:JIESHUN RAIL TRAFFIC TECH CHONGQING +1
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products