Reinforcement construction method with coral sand foundation deep vibroflotation cooperating with shallow watering impact rolling
A technology of impact rolling and coral sand, which is used in infrastructure engineering, soil protection, construction, etc., can solve the problems of general cementation of reef flats, unfavorable overall stability of islands and reefs, and impact on strength and stability. Stable and controllable quality, improved anti-liquefaction performance, and the effect of optimizing construction plans
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0042] Example 1: Discussion on the variation of the maximum compacted dry density of dredged coral sand with water content
[0043] Collect the coral sand (coral gravel soil, coral gravel sand, and coral medium sand) of a reclaimed island reef, add a certain amount of water to it, mix well, and perform drying and water content control according to the geotechnical test procedures. According to the "Standards for Soil Test Methods" (GB / T50123-1999), the maximum compacted dry density is detected, and the trend of the maximum compacted dry density with water content is studied. The test results are as follows: Figure 1-3 shown.
[0044] From figure 1 It can be seen that the maximum compacted dry density of coral gravel soil when dry is 1.85g / cm 3 , with the increase of water content, the maximum compacted dry density first decreased and then increased. When the water content was 14%, the maximum compacted dry density reached the minimum value; from figure 2 It can be seen t...
Embodiment 2
[0045] Embodiment 2: a kind of construction method of coral sand foundation deep vibrating and shallow impact rolling reinforcement, such as Figure 4 shown, including the following steps:
[0046] Step 1. Level the site, do a good job of construction preparations before vibroflotation (water supply, power supply, pile location layout, etc.), and then conduct two-point resonance tests with different spacings according to the requirements of design parameters, and determine the appropriate compactness through tests. Current, vibration retention time and vibrating point spacing, the vibrating spacing in this embodiment is between 2.5-3.5m, arranged in an equilateral triangle, and the vibrating depth is 0.5m above the design depth of the foundation treatment.
[0047] Step 2. During formal vibrating construction, if the water content of the foundation soil is low, the foundation should be irrigated before construction to ensure that the water content meets the design requirements...
PUM
Property | Measurement | Unit |
---|---|---|
Dry density | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com