Gate pump joint control-based water filling method for water transfer project of open channel of cascade pump station
A technology of joint control and pumping stations, which is applied in the fields of resources, instruments, electrical digital data processing, etc.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment
[0136] Taking the water filling process of the Tundian Pumping Station-Xitaishang Pumping Station of the Miyun Reservoir Adjustment and Storage Project as an example, according to the above method provided by the present invention, the cumulative water filling volume and cumulative water filling time are determined.
[0137] The Miyun Reservoir Storage Project is a supporting project for the Beijing section of the middle line of the South-to-North Water Diversion Project. The project transfers the remaining water from the provinces and cities along the middle line to the Miyun Reservoir under pressure, which can increase the water storage capacity of the Miyun Reservoir, replenish the water source of Mihuaishun, and improve the local water quality. ecosystem. Among them, the Tundian Pumping Station-Xitaishang Pumping Station contains a total of 6 pumping stations, which are Tundian (1), Qianliulin (2), Niantou (3), Xingshou (4), Li Shishan (5) , Xitaishang pumping station (6),...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com