Construction method of anchor rod static pressure pile

A technology of anchor static pressure pile and construction method, which is applied in the direction of sheet pile wall, foundation structure engineering, construction, etc., and can solve problems such as adverse effects of structure use function, water seepage and waterproof problems at the pile head position, and achieve flexible construction and improved The effect of bearing capacity and reliable quality

Inactive Publication Date: 2018-11-13
江苏地基工程有限公司
View PDF3 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, after the construction of local foundation reinforcement anchor static pressure piles is completed, the waterproofing of the lower waterproof membrane layer and the self-waterproof concrete layer of the bottom plate has failed, and only the top waterproof layer of the bottom plate is left to function. Water seepage often occurs in the location
The reason is that the waterproofing at the pile head nodes of the anchor static pressure pile was ignored during the construction. Although the structural foundation has been reinforced, there are problems with waterproofing, which has a negative impact on the use and function of the structure.

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Construction method of anchor rod static pressure pile

Examples

Experimental program
Comparison scheme
Effect test

Embodiment

[0031] Example: such as figure 1 Shown is the structural diagram of the anchor static pressure pile using a jack pile. The construction method of the anchor static pressure pile specifically includes the following steps:

[0032] (1) Determine the pile location: According to the pile location layout diagram and the corresponding axis, use a tape measure combined with the theodolite to measure the positioning pile holes, place a small sample in each pile hole, and then paint the pile center and clearly mark the location;

[0033](2) Opening: positioning and drilling the pile holes;

[0034] (3) Check and clean the pile holes: check whether there is any deviation in the center position of the pile according to the drawing, and clean up the construction waste in the hole after the pile hole deviation is correct;

[0035] (4) Install the pressure pile reaction force frame: After the anchor pile frame 5 (ie the reaction force frame) is erected vertically, according to the position...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention relates to a construction method of an anchor rod static pressure pile. The construction method specifically comprises the following steps that (1) a pile position is determined; (2) hole perforating is carried out; (3), a pile hole is checked and cleaned; (4) a pressing pile reaction frame is installed; (5) a pile is transported; (6) hoisting alignment and perpendicularity calibration are carried out, wherein the anchor rod pile frame is used for lifting the pile, and the perpendicularity of the pile is calibrated; (7) pile pressing and pile connecting are carried out, wherein the pile is pressed into positions with set depth by using a lifting jack in a sectionalized mode and taking anchor rods as a guide, starting from the second section of the pile, all sections of the pile are welded together before being pressed into the positions; and (8) pile pressing is finished, the pile is conveyed to the designed elevation, and after the pressing-in is completed, the pile holepile is cleaned, after electric welding is finished and the pile passes acceptance inspection, the pile is pressed to the elevation of a bottom plate of a basement after being cooled for 8 minutes, then the site is cleaned, and the frame is moved to and installed at another pile hole. According to the construction method, a building load is transferred to the deep stratum through the anchor rod pile, so that additional stress of a shallow layer soil body is reduced, then the compression deformation of the shallow layer soil body of a reinforced part is reduced or stopped, and therefore, settlement or floating of a building is stabilized.

Description

technical field [0001] The invention relates to the technical field of building construction, and relates to a pile foundation construction method, in particular to a construction method of an anchor static pressure pile, and is especially suitable for foundation reinforcement construction of existing buildings. Background technique [0002] With the in-depth development of domestic urbanization, more and more existing buildings will be rebuilt and expanded for various reasons, which also creates a need for reinforcement of the foundation. However, for basements in existing buildings, the construction site is narrow and the floor height is low; and some office or residential buildings may need to be rebuilt and expanded during use, and the construction noise control is strictly required at this time. In the existing technology, piles are generally used to reinforce the foundation of existing buildings, and construction is carried out with a static pile driver. During constru...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E02D7/20E02D5/52
CPCE02D5/526E02D7/20
Inventor 周曙东尚学伟陈家冬陈辰平
Owner 江苏地基工程有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products