BIM-based project supervision method and system
A technology of supervision and engineering, applied in the field of BIM-based engineering supervision and supervision methods and systems, can solve the problems of low efficiency of information verification and difficulty in mastering dynamic information verification, and achieve the effect of simple and convenient supervision
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0035] A BIM-based engineering supervision supervision, such as figure 1 shown, including the following steps:
[0036] Step S1: Establish the BIM model of the project according to the national architectural design standards.
[0037] Step S2: Construct a 3D model according to the construction plan of the construction party, generate multiple sub-models for the 3D model, compare the sub-models with the sub-units one by one, compare the sub-models in the 3D model with the sub-units in the project BIM model, and set up multiple Multiple threads occupy different computing cores, which reduces the queuing rate between comparison operations and shortens the computing time. At the same time, compare multiple groups of corresponding sub-models and sub-units, and evaluate whether the construction plan of the construction party is reasonable according to the time-consuming ratio of the comparison results and the size of the 3D model. Among them, the proportion is enlarged until the p...
Embodiment 2
[0043] A BIM-based engineering supervision supervision, such as figure 2 As shown, the difference from Embodiment 1 is that the system includes a background database for storing the data of the project BIM model.
[0044] The cloud server is connected to the background database for updating and managing the data in the background database.
[0045]The mobile terminal is connected to the cloud server, reads the project BIM model data in the background database through the cloud server, and transmits the three-dimensional model constructed by the construction plan to the cloud server, and generates multiple sub-models for the three-dimensional model. The mobile terminal includes a wireless transmission module, an entry module and a comparison module, the wireless transmission module is used to exchange information with the cloud server, the entry module is used to input the construction plan of the construction party, and the comparison module is respectively connected with the...