Method for comprehensive treatment of spartina alterniflora through terrace type flooding surrounding and mowing
A technology for comprehensive treatment of Spartina alterniflora, applied in the fields of botanical equipment and methods, lawn growth, hops/wine cultivation, etc. Stability and water storage performance, easy restoration of the beach ecological environment, the effect of reducing construction costs
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0046] In late May, choose 200m in the middle tide beach 2 The Spartina alterniflora community is used as the treatment area. At this time, Spartina alterniflora is the jointing stage, and the canopy height is about 45cm. Two earthen dams perpendicular to the coastline and two parallel to the coastline are built respectively. The dams are connected to each other to connect the treatment area. Enclosed into a closed area, the discharge port is reserved on the dam, and the upper part of the intercropping rice grassland is artificially cut, and the stubble height is 2-5cm. After the cutting is completed, the reserved discharge port of the dam is closed to form a 10m×20m enclosure. In the area, the embankment and mowing took 2 days. In the next 2 days, the embankment intercepted tidal water. Although the overall height of the embankment was about 50cm, it was slightly lower in some places, and the effective flooding depth was about 28cm after low tide. From the mowing and flooding i...
Embodiment 2
[0049] In late May, choose 200m in the middle tide beach 2 The Spartina alterniflora community is used as the treatment area. At this time, Spartina alterniflora is the jointing period, and the canopy height is about 45cm. Two PVC pipeline dams perpendicular to the coastline and two parallel to the coastline are built respectively. The dams are connected to each other to connect the treatment area. Enclose it into a closed area, reserve a PVC pipe gap as a drain, and then manually cut the upper part of the stubble field with a height of 2-5cm. After cutting, install the last PVC pipe to make the PVC pipe The dyke is completely enclosed to form a flooded area of 10m×20m. It takes 2 days to build and cut the dyke. In the following 2 days, the dyke intercepts the tide at high tide, and the water storage height is about 30cm after low tide. From the mowing and flooding in May to the beginning of May of the following year, the treatment area was a shallow water surface, and no new ...
PUM
Property | Measurement | Unit |
---|---|---|
Height | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com