Forecast scheduling method for reducing reservoir flood regulation starting water level by considering forecast errors

A scheduling method, flood control scheduling technology, applied in forecasting, genetic rules, weather condition prediction, etc., can solve the problem that the scheduling effect is not necessarily optimal

Active Publication Date: 2020-03-20
DALIAN UNIV OF TECH
View PDF4 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, the distribution of forecast errors shows that the probability of extreme forecast errors is relatively small, and

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Forecast scheduling method for reducing reservoir flood regulation starting water level by considering forecast errors
  • Forecast scheduling method for reducing reservoir flood regulation starting water level by considering forecast errors
  • Forecast scheduling method for reducing reservoir flood regulation starting water level by considering forecast errors

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0076] The method for determining the flood control forecast dispatching rules for lowering the flood starting water level of the reservoir considering the flood forecast error proposed by the present invention is mainly divided into two parts: the design of the pre-discharging scheme for lowering the starting water level, and the optimization of the dispatching rules considering the forecast error distribution. The present invention takes the Nierji Reservoir as an example, and describes the specific implementation in detail in combination with technical solutions and accompanying drawings. Specifically include the following steps:

[0077] In the first step, based on the flood forecasting scheme for the reservoir's control basin and downstream intervals, determine the discriminant indicators for flood control forecasting, dispatching and pre-discharging.

[0078] In order to improve the flood control benefit of Nierji Reservoir, the present invention firstly analyzes the acc...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a forecast scheduling method for reducing reservoir flood regulation starting water level by considering forecast errors, and belongs to the technical field of flood preventionforecast scheduling. The method comprises the following steps: firstly, performing flood forecasting feasibility analysis on a reservoir control basin, and identifying forecasting error distributionby adopting a maximum entropy principle; secondly, formulating a dispatching rule framework for reducing the flood starting water level of the flood rising section by utilizing a pre-discharge thoughtfor the whole dispatching system; optimizing the forecast scheduling framework to obtain a forecast scheduling scheme optimization point set; thirdly, screening out all optimization point sets meeting the upstream and downstream flood control safety under the condition of the maximum forecast error from the forecast scheduling scheme optimization point set; and finally, comprehensively considering forecast errors and different preferences of a decision maker, and evaluating optimal forecast scheduling scheme points by utilizing a binary comparison method and a fuzzy optimization model to obtain a final forecast scheduling scheme. The method is simple and easy to operate, and the flood control benefit of the reservoir and the elasticity of a downstream protection point under the flood action are improved under the condition of keeping the interest benefit.

Description

technical field [0001] The invention belongs to the technical field of flood control forecasting and dispatching, and relates to a flood control forecasting and dispatching method that considers forecasting errors to reduce the starting water level of a reservoir flood. Background technique [0002] With the continuous advancement of the information age and the continuous improvement of flood forecast accuracy and forecast period, reservoir flood control forecasting and dispatching have been widely developed (Dalian University of Technology, National Flood Control and Drought Relief Headquarters Office. Reservoir Flood Control Forecasting and Scheduling Method and Application[M ]. China Water Conservancy and Hydropower Press, 1996: 1-6.). According to the different adjustment methods of the flood starting water level, the flood control forecasting and dispatching methods can be mainly divided into flood control forecasting and dispatching methods that raise the starting wate...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/04G06Q10/06G06Q50/06G06N3/12
CPCG06Q10/04G06Q10/063G06Q50/06G06N3/126Y02A10/40G06Q50/26G06Q10/0635G01W1/10G05B17/02
Inventor 魏国振丁伟梁国华何斌唐榕王猛马杏周惠成
Owner DALIAN UNIV OF TECH
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products