A bridge engineering and costing technology, applied in the field of bridge engineering costing system, can solve the problems of low reliability of engineering costing system, achieve the effect of improving storage efficiency and reliability, reducing the risk of data loss, and improving reliability

Active Publication Date: 2020-06-09
HENAN POLYTECHNIC INST
View PDF3 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] The purpose of the present invention is to provide a bridge engineering cost system, which is used to solve the problem of low reliability of the existing engineering cost system

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Bridge engineering cost system

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0029] Such as figure 1 As shown, this embodiment provides a bridge engineering cost system, including an identity information acquisition module, an identity information verification module, an engineering parameter acquisition module, an engineering cost result acquisition module, a storage module and a display module. Each module may be a hardware module or a software module. If each module is a hardware module, the bridge project cost system is a hardware system composed of related hardware devices; if each software module is a software module, the execution subject of the bridge project cost system is a computer device or a server device. Regardless of whether each module is a hardware module or a software module, the connection relationship of each module is as follows: figure 1 mentioned.

[0030] The identity information collection module is used to collect the first identity information of the operator. The first identity information may be fingerprint information, ...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention relates to a bridge engineering cost system which comprises an identity information acquisition module, an identity information verification module, an engineering parameter acquisitionmodule, an engineering cost result acquisition module, a storage module and a display module. The identity information verification module is used for verifying whether the collected first identity information meets the requirements or not; only an operator meeting the identity requirement can obtain data information related to the bridge engineering cost; furthermore, the bridge engineering parameters and the bridge engineering cost result are stored in a memory database and are backed up to a disk database; and when the storage duration is greater than the preset storage duration, the related data information in the memory database is deleted to reduce the data volume in the memory database, thereby improving the storage performance of the memory database, and the system can integrate the advantages of the characteristics of the memory database and the disk database to improve the reliability and safety of the bridge engineering cost system.

Description

technical field [0001] The invention relates to a bridge engineering cost system. Background technique [0002] The project cost refers to the construction price of the project, which refers to the sum of all the expected or actual costs required to complete the construction of a project. For example, the project cost of a bridge refers to the expected or actual required total cost sum of fees. With the rapid development of my country's economy, it is necessary to establish a highly reliable and intelligent bridge engineering cost system. Contents of the invention [0003] The purpose of the present invention is to provide a bridge engineering cost system, which is used to solve the problem of low reliability of the existing engineering cost system. [0004] In order to solve the above problems, the present invention adopts the following technical solutions: [0005] A bridge engineering cost system, comprising: [0006] The identity information collection module is us...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): G06F21/32G06F21/62G06F21/78G06F3/12G06Q30/02G06Q50/08E01D1/00
CPCE01D1/00G06F3/1243G06F3/1247G06F3/1257G06F21/32G06F21/6218G06F21/78G06Q30/0283G06Q50/08
Inventor 谢颖川董文娟刘长玲董玉萍姚苗苗王金杰张凯歌张振华贺敬礼卢佳梁艺培
Owner HENAN POLYTECHNIC INST
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products