Project cost management system and method

A technology of engineering cost and management system, which is applied in the field of management system, can solve problems such as inaccurate evaluation results, achieve accurate accounting, accurate evaluation results, and facilitate later query

Pending Publication Date: 2020-08-18
达信建设发展有限公司
View PDF6 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0005] Aiming at the deficiencies in the existing technology, the purpose of the present invention is to provide a project cost management system and method, wh

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Project cost management system and method
  • Project cost management system and method
  • Project cost management system and method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0047] See figure 1 , as shown in the figure, the engineering cost management system of the present invention includes a management platform 1, a construction unit terminal 3, a design unit terminal 4, and a construction unit terminal 5, specifically, a construction unit terminal 3, a design unit terminal 4, and a construction unit terminal 5 They are respectively connected to the management platform 1 by wired communication or wireless communication. Preferably, in this embodiment, the construction unit terminal 3, the design unit terminal 4 and the construction unit terminal 5 are respectively connected to the management platform 1 through the wireless transmission module 6.

[0048] Among them, if the project completion progress is different, the labor cost and material cost required by the project are different. Therefore, for different project completion progress, the current project valuation model formula should be used to calculate the project cost.

[0049] More speci...

Embodiment 2

[0056] See Figure 5, as shown in the figure, is another embodiment of the present invention. In the actual construction process, the actual construction progress and existing inventory will affect the overall project cost. Therefore, this embodiment and The difference of the previous embodiment is that the management platform 1 also includes a progress coordination module 19 and an inventory statistics module 20. Specifically, the progress coordination module 19 and the inventory statistics module 20 are respectively connected to the information input module 13 by communication, and the progress coordination module 19 It is used to input the current project progress information, and the current project progress information is transmitted to the central processing module 14 through the information input module 13, and the project progress report is generated at the same time, and the project progress report is transmitted to the display module through the information output mod...

Embodiment 3

[0058] See Image 6 , as shown in the figure, as shown in the figure, is another embodiment of the present invention. During the actual construction process, the change of the project will also affect the engineering cost of the overall project. Therefore, this embodiment is the same as the previous one. The difference between the embodiments is that the management platform 1 also includes an engineering change management module 21. Specifically, the engineering change management module 21 communicates with the information input module 13 to change engineering information according to actual needs. More specifically, the engineering change management The management module 21 includes an engineering change application unit 211 and an engineering change review unit 212. The engineering change application unit 211 is communicated with the engineering change review unit 212. The engineering change application unit 211 is used to apply for an engineering change. The engineering chan...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a project cost management system. The system comprises a management platform, a construction unit terminal, a design unit terminal and a construction unit terminal. The management platform comprises a mode selection module, a sorting module, an information input module, a central processing module, an information output module, a display module and an information extractionmodule. The mode selection module is used for transmitting the current mode state information to the central processing module for storage through the information input module; the sequencing moduleis used for sequencing related engineering cost data input by the construction unit terminal, the design unit terminal and the construction unit terminal, transmitting the data to the central processing module for classification and summation processing, generating a cost list, and displaying the cost list through the display module; therefore, a user can calculate the engineering cost in different modes according to the actual situation of the engineering, and the calculation of the engineering cost is more accurate and convenient.

Description

technical field [0001] The present invention relates to the technical field of management systems, more specifically, it relates to a project cost management system and method. Background technique [0002] The direct meaning of project cost refers to the construction price of the project. The three elements of project cost include quantity, price and fee. Project cost, water conservancy project cost, electric power project cost, communication project cost, aerospace project cost, etc. Project cost refers to the total cost of a certain project construction, and its core content is investment estimation, design estimation, revised estimation, construction The main task of the project cost is to calculate the direct costs (labor, materials and equipment), enterprise management fees, measure fees, and regulations included in the project according to the drawings, quotas, and list specifications. , profits and taxes, etc. In the process of calculating and counting project costs...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/08G06Q10/06G06Q30/02
CPCG06Q10/0875G06Q10/0633G06Q30/0206
Inventor 蒿保玉张凯李立高印成侯涛张磊陈勇
Owner 达信建设发展有限公司
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products