A circular foundation pit support structure and its application method
A foundation pit support and support structure technology, which is applied in the direction of foundation structure engineering, excavation, construction, etc., can solve problems such as delaying construction time, and achieve the effects of shortening the construction period, high safety, and low wear
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0046] see Figure 1-11 , a circular foundation pit support structure, which includes a plurality of arc-shaped guard plate structures 1, and the adjacent multiple arc-shaped guard plate structures 1 are linked by hinges 3 to form a cylindrical shape that can be folded inward; adjacent The two arc-shaped guard plate structures 1 can be relatively rotated at a certain angle, and the entire support structure can be folded into a petal shape; each inner wall of the arc-shaped guard plate structure 1 is respectively fixed with a hook 6, Round holes 5 are processed at different heights of the arc-shaped guard plate structure 1; the adjacent arc-shaped guard plate structure 1 is shaped and fixed by the buckle 2 after stretching, and makes the entire support structure a stable cylindrical shape. By adopting the circular foundation pit support structure with the above structure, it can be used to support the inner wall of the foundation pit during the excavation process of the foundat...
Embodiment 2
[0051] see Figure 12 , 15 , 16, the method for using the circular foundation pit support structure to carry out foundation pit support, it includes the following steps:
[0052] Installation steps of support structure:
[0053] Step 1, carry out the excavation of preliminary foundation pit;
[0054] Step 2, when the preliminary foundation pit is dug to a certain depth, fold the support structure in the folded state on the upper part of the foundation pit to make its radius smaller, and then, use the crane, wire rope 8 and hook 6 to fold the entire folded structure The supporting structure is lifted and put into the preliminary foundation pit;
[0055] Step 3, inside the foundation pit, unfold the folded support structure again, so that the positioning protrusion 104 on the outer wall of the arc guard plate structure 1 is in contact with the inner side wall of the foundation pit, and then install the buckle 2 to the entire support structure. The support structure is fixed,...
Embodiment 3
[0059] see Figure 13 , 14 , 15, 17, when the foundation pit is stabilized, when the supporting structure needs to be removed, the removal process follows the bottom-up removal process, and the removal steps are as follows:
[0060] Step 1, loosen the nut 4 of the support structure at the bottom, remove the buckle 2, and fold the arc-shaped guard structure 1 inwardly. At this time, the entire support structure will be folded into a petal shape, and its diameter will be smaller than that of the upper support The supporting structure behind the circle;
[0061] Step 2, using the crane and the wire rope 8 to hang and connect with the folded support structure of the bottom layer, start the crane, and lift the support structure of the bottom layer out of the foundation pit;
[0062] Step 3, after the last support structure is removed, repeat steps 1 to 2;
[0063] Step 4, until all the supporting structures inside the entire foundation pit are completely dismantled and taken out...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com