Greenbelt drainage side ditch structure, component thereof and road
A green belt and side ditch technology, applied in side ditch/curb, sewage removal, roads, etc., can solve problems such as inability to discharge, easy to store rainwater, and difficult to clean up.
Patent Information
- Authority / Receiving Office
- CN · China
- Patent Type
- Applications(China)
- Current Assignee / Owner
- Publication Date
- 2020-10-27
- Estimated Expiration
- Not applicable · inactive patent
Smart Images

Figure 1 
Figure 2 
Figure 3
Abstract
Description
technical field
[0001] The invention relates to the technical field of buildings, in particular to a green belt drainage side ditch structure, its components and a road. Background technique
[0002] The green belt refers to the strip for greening. It can eliminate visual fatigue, purify the environment, beautify the city, reduce traffic accidents, etc., and occupies an irreplaceable important position in the city. Separation of traffic by the green belt, with safety features.
[0003] Side ditch refers to the ditches set up on both sides of the roadbed to collect and drain the running water from the road surface, road shoulder and side slope.
[0004] There are side ditches on both sides of the green belt. The side ditches are used for drainage. However, rainwater is often accumulated in the side ditches. If the rainwater accumulates at the bottom of the side ditches all the year round, silt and moss will be generated inside, making it impossible to discharge and difficul...
Examples
Embodiment
[0058] Such as Figure 1-Figure 4 As shown, a green belt drainage gutter structure provided in this embodiment includes a green belt 10 and a side ditch main body 20; Both sides; the gutter main body 20 includes a bottom edge 23, a first side edge 21, a second side edge 22 and a drainage edge 211, and the first side edge 21 and the second side edge 22 are respectively formed on both sides of the bottom edge edge 23 and the first The side 21 and the second side 22 are arranged in parallel and at intervals, and the bottom 23, the first side 21 and the second side 22 form a first accommodating chamber 24 for accommodating precipitation, and the second side 22 and the greening The belt 10 is fitted together, the top of the first side 21 is in contact with the bottom of the drainage side 211, and the first side 21 and the drainage side 211 are set at an angle, and the top of the drainage side 211 is higher than the ground surface for introducing precipitation into the main body of ...