[0021] Such as Figure 1-4 The figure shows a pipe jacking construction method based on the whole process of real-time monitoring, including the following steps:
[0022] (1) Select multiple pipe joints 2 for setting the monitoring section 5 along the pipe jacking direction 4, and mark them;
[0023] (2) The pipe joint 2 of the monitoring section 5 needs to be set, and before it is lowered, a strain gauge and a collector are installed on it, and the strain gauge communicates with an external control terminal through the collector;
[0024] (3) During the pipeline jacking process, the collector collects the strain data on each strain gauge and feeds back to the external control terminal;
[0025] (4) The external control terminal adjusts the jacking force and grouting parameters according to the received real-time data.
[0026] With the present invention, the strain gauge and the collector can be used to obtain real-time stress changes in the pipeline during the construction...