Jacking force control method based on uninterrupted real-time monitoring for pipeline stress and used for pipe jacking construction

A technology of real-time monitoring and control method, applied in the direction of pipeline laying and maintenance, pipe/pipe joint/pipe fitting, mechanical equipment, etc. The effect of comprehensive data collection

Active Publication Date: 2020-12-04
核工业井巷建设集团有限公司
View PDF6 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

However, due to the complexity of geological conditions, some problems are prone to occur during the pipe jacking construction process, such as the rotation of the machine head and pipe joints during the jacking process, loss of control of the pipe jacking direction, rolling during the jacking process, and surface subsidence, etc.
[0003] Jacking force is the most critical factor in pipe jacking construction, especially in long-distance pipe jacking construction, the inaccurate calculation of jacking force will directly lead to too many or too few relay stations, and too much will result in a large amount of manpower and material resources Waste; too little will cause insufficient jacking force, or the excavation surface will collapse or bulge, or the pipe joint will be damaged if it exceeds the strength of the pipe, or the design stress limit of the back wall will be exceeded, resulting in shear failure of the wall and deformation and instability , affect the smooth progress of the project and even lead to the failure of the whole project. Therefore, how to accurately and effectively control and adjust the jacking force during the pipe jacking construction process is particularly important, but the existing technology lacks corresponding effective methods

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Jacking force control method based on uninterrupted real-time monitoring for pipeline stress and used for pipe jacking construction
  • Jacking force control method based on uninterrupted real-time monitoring for pipeline stress and used for pipe jacking construction
  • Jacking force control method based on uninterrupted real-time monitoring for pipeline stress and used for pipe jacking construction

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0022] Such as Figure 1-4 A jacking force control method for pipe jacking construction based on continuous real-time monitoring of pipeline stress is shown in the figure, including the following steps:

[0023] (1) Select multiple pipe joints 2 for setting the monitoring section 5 along the pipe jacking direction 4, and mark them;

[0024] (2) The pipe joint 2 of the monitoring section 5 needs to be set, and before it is lowered, a strain gauge and a collector are installed on it, and the strain gauge communicates with an external control terminal through the collector;

[0025] (3) During the pipeline jacking process, the collector collects the strain data on each strain gauge and feeds back to the external control terminal;

[0026] (4) According to the received real-time data, the external control terminal selects the data collected at the initial stress-free state of the pipe joint 2 of each monitoring section as the zero point of the pipe jacking strain test, and then c...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a jacking force control method based on uninterrupted real-time monitoring for pipeline stress and used for pipe jacking construction. The jacking force control method based onuninterrupted real-time monitoring for pipeline stress and used for pipe jacking construction comprises the following steps: (1) a plurality of pipe joints are selected for setting monitoring sections in the jacking direction of pipe jacking, and marking is carried out; (2) before the needed pipe joints provided with the monitoring sections are put down, strain gauges and collectors are installedon the pipe joints, and the strain gauges are in communication connection with an external control terminal through the collectors; (3) in a pipeline jacking process, the collectors collect strain data on the strain gauges and feed back the strain data to the external control terminal; and (4) the external control terminal draws a relationship curve graph of the surface stress of a steel pipe, ajacking force, a grouting pressure and a jacking length according to the received real-time data, and finally controls and adjusts the jacking force according to the trend change of the relationship curve graph. In this way, the jacking force can be better controlled and adjusted during construction, so that the smooth progress of pipe jacking construction is guaranteed.

Description

technical field [0001] The invention relates to a pipe jacking construction method, in particular to a jacking force control method for pipe jacking construction based on continuous real-time monitoring of pipeline stress. Background technique [0002] With the development of economy and society, there are more and more projects such as underground comprehensive pipe corridors and urban water transmission lines. These projects inevitably cross roads, rivers and existing buildings. If these pipelines laid under the existing facilities adopt a large-area open-cut method, it will not only cause great damage to the existing facilities, but also have a great impact on the environment and traffic. The pipe jacking construction method can well avoid these problems, and the construction speed is fast and the cost is low. The pipe jacking construction mainly refers to setting a jack in the pipe jacking working well 1, and then using a high-pressure oil pump to supply oil to ensure t...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): F16L1/11F16L1/028
CPCF16L1/11F16L1/028
Inventor 潘振学孙余好申永江卢国杰张晨曦
Owner 核工业井巷建设集团有限公司