Tunnel primary support and waterproof and drainage combined system and construction method
A primary support and joint system technology, applied in drainage, tunnel, tunnel lining, etc., can solve the problems of unfavorable safe use and easy dripping, and achieve the effect of material saving, convenient use and investment saving
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0029] The following will clearly and completely describe the technical solutions in the embodiments of the present invention with reference to the accompanying drawings in the embodiments of the present invention. Obviously, the described embodiments are only some, not all, embodiments of the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0030] Such as Figure 1-4 As shown, the tunnel primary support and water-proof and drainage combined system of the present invention includes hollow anchor rods 1 radially arranged along the tunnel contour line 4, the hollow anchor rods 1 are filled with gravel 2, and the tunnel contour line 4 Shotcrete 3 is provided on the inner wall of the body; hollow anchor rod 1 is provided with perforated holes 7 and wrapped with geotextile 8; steel mesh 9 is arranged a...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com