A construction method for new pipe connection and original pipe plugging in large-scale sewage pipeline relocation

PendingCN109208737ASolve the blocking problemGuarantee the quality of plugging constructionSewer pipelinesSewageSteel frame
The invention provides a construction method for new pipe connection and original pipe plugging in large-scale sewage pipeline relocation. The construction method comprises the following steps: firstly, a new pipe receiving well is constructed beside an existing working well adjacent to the original sewage pipe, and the shaft wall of the existing working well is sawn, so that the new pipe receiving well is communicated with the existing working well; and then the original sewage pipe is temporarily plugged by adopting temporary plugging gate in the existing working well, wherein the temporaryplugging gate comprises a grille steel frame and a steel baffle. After the temporary plugging gate is installed, the diver goes down the shaft and plugs the original sewage pipe at the downstream partof the temporary plugging gate with brick masonry stone. After the plugging is completed, the underwater concrete is poured between the temporary gate valve and the plugs. The method adopts a temporary gate for temporary blocking, which can reduce the impact force of water flow on the diver and the blocking wall, reduce the operation risk, improve the blocking construction quality, and reduce theconstruction risk in the excavation process of the deep foundation pit of the metro.
Owner:URBAN MASS TRANSIT ENG CO LTD OF CHINA RAILWAY 11TH BUREAU GRP

Steel structure keel masonry brick outer curtain wall system and its construction method

ActiveCN107227813ASolve the height-thickness ratioAddressing Structural StabilityWallsBrickBuilding energy
The invention provides a steel structure keel masonry brick outer curtain wall system and its construction method, wherein a curtain wall keel of the curtain wall system comprises a cross supporting angle steel arranged in a full length, and main and secondary keels; the curtain wall is a ganged brick curtain wall, and the part of the wall of which bottom part is located beneath the bottommost cross supporting angle steel is built above a main structure plate or a main structure bracket; the rest part is paved on the cross supporting angle steel; position closing to the bottom part of the curtain wall is provided with an apron flashing board with high inside and low outside; horizontal binding reinforcement meshes are staggered in the curtain wall at intervals; an air interlayer forms between the curtain wall and the main structure outer wall; part of the bottom part of the air interlayer beneath the apron flashing board is grouted by cement mortar. The masonry brick is combined with the curtain wall keel system, thus the ratio of height to thickness and the structure stability are effectively solved; the air interlayer plays the heat insulation and ventilation effects, thus the purpose of building energy-saving is saved; multiple waterproof structures are arranged so that the saltpetering of the ganged brick curtain wall and the water seepage of the main structure outer wall are reduced.
Owner:BEIJING LIUJIAN CONSTR GRP

Novel tunnel segment structure and stress monitoring device thereof

The invention discloses a novel tunnel segment structure and a stress monitoring device thereof, and relates to the technical field of tunnel laying and tunnel and underground engineering. According to the key points of the technical scheme, the novel tunnel segment structure includes novel lining segments capable of being spliced into unit tubes, sealing gaskets and pressure sensors, wherein thesealing gaskets and the pressure sensors are arranged at the junctions of the segments. The segments are in a cross shape, grooves and convex strips are arranged at the side edges of the segments alternatively and the segments are connected through the grooves and the convex strips in a joggle-joint mode to form a tunnel. The side walls of the segments are covered with rubber asphalt waterproof coating, and vulcanized ethylene-propylene rubber elastic sealing gaskets are arranged at the joints of the segments. The pressure sensors are arranged above the convex strips. Compared with the prior art, the sliding friction between the segments is increased through the cross-shaped segments, the pipeline structure is more stable, and the joggle-joint structure simplifies the construction process;meanwhile, a pressure monitoring device is additionally arranged for monitoring and recording the pressure subjected by the segments in real time for carrying out risk prevention, and further research is facilitated; and in addition, a waterproof system has certain reference value for the problem of water seepage.
Owner:王旭

Large-volume concrete and preparation method thereof

The invention discloses large-volume concrete and a preparation method thereof, and belongs to the field of a building material. The key point of the technical scheme is as follows, the large-volume concrete comprises the following components in parts by weight: 180 to 190 parts of cement, 170 to 180 parts of water, 730 to 740 parts of medium sand, 1010 to 1020 parts of detritus, 70 to 80 parts ofcoal ash, 170 to 180 parts of ore powder, 4 to 5 parts of water reducer and 4 to 6 parts of additive, wherein the water reducer is a polycarboxylic acid water reducer; the additive comprises low-temperature expansible graphite, organic bentonite and carbon fiber; and the weight ratio of the low-temperature expansible graphite to the organic bentonite to the carbon fiber is 3:1:1. Through the low-temperature expansible graphite, the internal temperature of the concrete is reduced and the internal and external temperature difference of the concrete is reduced; furthermore, the expanded graphitecan block crack, so that the water seepage condition is reduced; through cooperative use of the organic bentonite and the low-temperature expansible graphite, the bentonite is expanded when encountering water, so that capillary channels and microcracks can be blocked timely, and salt corrosion can be interdicted and eliminated; and due to addition of the carbon fiber, the strength and the toughness of the concrete can be improved and the mechanical property of the concrete can be improved.
Owner:上海石化安东混凝土有限公司

Construction technology for sunken-type bathroom

The invention discloses a construction technology for a sunken-type bathroom and relates to the technical field of bathroom construction. The construction technology comprises the following steps thatS1, a foundation drainage part is arranged, specifically, a foundation drainage channel is formed in a structural layer; S2, a foundation waterproof part is arranged, specifically, a structural waterproof layer is made on the structural layer; S3-1, supporting columns are built, specifically, the multiple supporting columns are evenly arranged at intervals; S3-2, drainage pipes are arranged in aburied mode, specifically, the top drainage pipes are arranged in spaces formed by the supporting columns in the buried mode; S3-2.1, water storage testing is conducted; S3-3, water absorbing and permeating layers are laid, and chambers formed by the supporting columns are filled with mixtures of light ceramsite and high-water-absorption fibers; S3-4, a bearing layer is poured, reinforcement fabrics are placed on the supporting columns, and concrete is laid on the reinforcement fabrics; S4, the bearing layer is subjected to waterproof treatment; and S5, ceramic tiles are laid, and joint filling is conducted on the connecting positions of the adjacent ceramic tiles to form pointing joints. According to the construction technology, by arranging an empty space integrates the water absorptionand drainage functions, the effect of reduction of water seepage of the bathroom is achieved.
Owner:浙江蓝城建筑装饰集团有限公司

Underground comprehensive pipe gallery structure and construction method thereof

The invention relates to the technical field of underground engineering, in particular to an underground comprehensive pipe galley structure and a construction method thereof. The construction method includes the steps of laying a concrete cushion layer on a foundation pit bottom, laying a waterproof coiled material layer of a baseboard on the concrete cushion layer, laying a baseboard protecting layer on the waterproof coiled material layer of the baseboard, manufacturing a main pipe gallery body on the baseboard protecting layer, laying a waterproof coiled material layer of a sidewall on the outer surface of the sidewall of the main pipe gallery body, laying a waterproof coiled material layer of a top board on the outer surface of the top board of the main pipe gallery body, laying a polystyrene board protecting layer on the waterproof coiled material layer of the sidewall, and laying a concrete protecting layer on the waterproof coiled material layer of the top board. The underground comprehensive pipe gallery structure includes the main pipe gallery body, the outer bottom surface of the main pipe gallery body is successively provided with the baseboard protecting layer, the waterproof coiled material layer of the baseboard and the concrete cushion layer in a laid mode from top to bottom. The underground comprehensive pipe galley structure is conducive to reduction of water seepage circumstances inside the main pipe gallery body and prolongs the service life of underground comprehensive pipe galleries.
Owner:CCFEB CIVIL ENG

Inversion type energy conservation roofing system and construction method thereof

Provided is an inversion type energy conservation roofing system and a construction method thereof. The system comprises from bottom to top a concrete base layer, a cement mortar screeding layer, a waterproof cushion layer, a heat preservation drainage layer, transverse tile hanging battens and roofing tiles; the heat preservation drainage layer comprises from bottom to top a heat preservation plate layer, a cement mortar protection layer, a longitudinal downstream batten and an aluminum foil coiled material; the longitudinal downstream batten is fixedly connected to the cement mortar protection layer through an anchoring part. According to the inversion type energy conservation roofing system and the construction method thereof, the construction of the system is simple and the construction is convenient; an inversion structure is adopted, a heat preservation layer is laid on a waterproof layer, the cement mortar protection layer is added to cover the heat preservation layer, so that the heat preservation layer and the waterproof layer are protected, destroying of thermal stress, ultraviolet light and other factors is effectively avoided, the heat preservation, thermal insulation and waterproofness effects of the roofing are ensured, and the roofing structure is reinforced; a wooden support is not used, the situation that the anchoring part is knocked in the cement mortar screeding layer and the concrete base layer of a house is avoided, thus the integrity of the screeding layer and a structure layer of the house are guaranteed, the heat preservation effect is better, and the possibility that water seepage occurs in a tack hole place is reduced.
Owner:LJLZ BEIJING BUILDING MATERIALS CO LTD

Nutritional additive for improving water and soil in seedling stage and preparation method thereof

The invention discloses a nutritional additive for improving water and soil in the seedling stage. The nutritional additive is composed of the following components in parts by weight: 24 to 26 parts of bentonite, 21 to 22 parts of brown sugar, 4 to 5 parts of critic acid, 10 to 12 parts of phosphor nitrate fertilizer, 22 to 24 parts of soybean powder, 23 to 26 parts of rapeseed cake powder, 6 to 8 parts of ferrous sulfate, 42 to 45 parts of volcanic rock, 12 to 16 parts of aged tea, 63 to 67 parts of waste crop straws, 15 to 20 parts of threonine mother liquor, 3 to 5 parts of composite fungal hyphae, and a proper amount of water. The porous structure, which is obtained by mixing fungus dregs and bentonite, of the nutritional additive can improve the water content and water holding capacity of soil for breeding seedlings; moreover, the irrigation amount in the period stage can be reduced, the root will not be destroyed by excess water, the organic substances in the fungus dregs can cooperate with the chelating liquid to improve the pH value of soil, at the same time, the organic microbe number and organic substance content of soil are greatly increased, and thus the crop growth in the seedling stage can be promoted.
Owner:DINGYUAN PEIZHANG ECOLOGICAL GARDEN CO LTD

Foundation construction method

InactiveCN108360501AImprove efficiencyAvoid waterproof constructionSoil preservationRebarMelamine
The invention discloses a foundation construction method. The foundation construction method comprises the following steps that multiple cement piles are driven into the ground, wherein the tops of the cement piles are provided with ribs extending out of the interiors; multiple rebars are welded to one another and connected to form a rectangular reinforcement cage; the reinforcement cage is hoisted to the tops of the multiple cement piles, and the ribs are welded to the reinforcement cage; wood panels are arranged at the periphery of the reinforcement cage in a surrounding manner, concrete ispoured into a chamber defined by the wood panels, pouring is stopped when the three seventh height of the reinforcement cage is submerged by the concrete, waiting lasts for three hours, and then, pouring of compound type concrete is conducted, so that finally, the top height of the compound type concrete exceeds the upper surface of the reinforcement cage by two centimeters; and after the compoundtype concrete is dry, the peripheral wood panels are removed, wherein raw materials of the compound type concrete comprise cement, coal ash, sodium methyl silicate, sodium ethyl silicate, MS resin and melamine. When a foundation is constructed, waterproofing treatment is conducted; efficiency is high; the problem that waterproofing construction is conducted in the subsequent decoration process isavoided; and cost is lowered.
Owner:TAIZHOU MINGTAI CONSTR ENG

Construction method of high-strength sealing wall with anti-seepage function in mine roadway

The invention relates to a construction method of a high-strength sealing wall with an anti-seepage function in a mine roadway and belongs to the field of protection measures for mine water disasters.The method includes the steps of 1, forming grooves in a top plate and a bottom plate in a sealed place and the two sides of the sealed place and removing waste on the site; 2, determining the positions and size of three holes; 3, constructing a brick wall, installing anchoring rods in grooves formed in a concrete wall and constructing a steel bar framework; 4, before construction of a wall body,filling the holes, adopting a vertical guide pipe insertion method for pouring of the concrete wall until pouring of the concrete wall is finished, and spraying slurry after construction of the wallbody is finished. An anti-seepage concrete wall construction process of a dam is combined, and through installation of an underground anti-seepage high-strength sealing device, the anti-seepage high-strength sealing wall which is convenient in construction, small in seepage amount and high in safety and reliability and can achieve sealing in a water permeation period is provided. The sealing walladopts a combined wall body structure composed of the brick wall, a filling layer and the concrete wall and solves the problem that water can permeate when a water influx accident happens under a welland it is needed to construct a waterproof sealing wall.
Owner:LIAONING TECHNICAL UNIVERSITY

Frame-hiding three-glass energy-saving sound insulating window and manufacture method thereof

The invention relates to a frame-hiding three-glass energy-saving sound insulating window and a manufacture method thereof. The sound insulating window is characterized by comprising a flat opening window sash (1) consisting of a hollow glass inner layer and a single glass outer layer, a fixed window sash (2) and a window outer frame (3), wherein a muntin (11) needs to be arranged between the flat opening window sash (1) and the fixed window sash (2) according to design style; the hollow glass (4) is fixedly connected with the flat opening window sash (1) by a seal adhesive tape (5) and a flat opening window sash press strip (6); the single glass (7) is fixedly connected with the outer side of the flat opening window sash (1) by a double-side adhesive tape (8) and silicone structure adhesive (9); the top surface of the window outer frame (3) is in flexible embedded seal connection with a wall body (10) by a polyurethane foaming agent; and the top surface of the flat opening window sash (1) is connected with a window frame by a stainless steel sliding support (12). The invention has the advantages of firm and durable structure, tensile resistance, high shearing strength, stable quality, high noise reducing and sound insulating performance, air tightness, high watertight performance, high heat preserving performance and attractive appearance.
Owner:武汉鸿和岗科技有限公司

Tunnel fabricated prestressed lining design method

The invention discloses a tunnel fabricated prestressed lining design method. The method comprises the steps of survey and calculating design and preparation and installation of sectional type liningsegments. The survey and calculating design comprises the following steps of A, determining an inner limit of a tunnel and an inner contour line of a lining; B, setting lining and inverted arch thickness values; C, calculating the pressure of surrounding rocks in the tunnel; D, calculating lining internal force and all loads borne by the surrounding rocks; E, calculating stress; F, conducting prestressed reinforcement arrangement; and G, conducting checking calculation. During preparation and installation of the sectional type lining segments, a factory manufactures a plurality of segments ina fragmentation mode and installs prestressed tendons; and the plurality of sectional type lining segments are spliced on site. According to the method, structural design is performed through a load-structure method to obtain design data, the segments can be put into use after being prefabricated in the factory and installed on site, the construction progress is improved, the finished prestressedsteel bars of a finished product are arranged on the tensioned side, the negative bending effect generated when the prestressed steel bars are arranged on the same side is overcome, the joint connection is tight, the water seepage and gushing probability is reduced, and the quality is ensured.
Owner:XIHUA UNIV

Anti-interference anticracking agent for concrete and preparation method thereof

InactiveCN101805143AShorten the period of disturbanceReduce intensitySolid componentFiber
The invention relates to an anti-interference anticracking agent for concrete, which comprises a setting regulator for shortening the interfered period of the concrete, a hydramine admixture for enhancing the early strength of the concrete, an expansion function admixture for enhancing the self-healing rate of the interfered concrete, a powdery early-strength admixture for enhancing the early strength of the concrete, and a fiber function admixture for enhancing the anticracking property of the concrete. The anti-interference anticracking agent is composed of a liquid component and a solid component, wherein the liquid component comprises the setting regulator and the hydramine admixture, and the solid component comprises the expansion function admixture, the fiber function admixture and the powdery early-strength admixture. The preparation method comprises the following steps: preparing the liquid component of the anti-interference anticracking agent, preparing the solid component of the anti-interference anticracking agent, and evenly mixing the liquid component and the solid component in proportion for use. The invention can be used for improving the anti-interference anticracking property of the concrete, so that the concrete can perform more functions in bridge repairing. The anti-interference anticracking agent is an admixture which has the advantages of controllable composition and diversified products, and is suitable for mass production.
Owner:TONGJI UNIV

Method for preparing ultra-wide aluminium-plastic composite panel and special devices thereof

The invention discloses a method for preparing an ultra-wide aluminium-plastic composite panel and special devices thereof. The method comprises the followings steps: adopting at least two single screw extrusion machines to simultaneously provide uniform materials for a T-shaped die head; extruding plastic panels in the T-shaped die head; and under the conditions of heating and pressurizing, compositing the plastic panels with upper and lower aluminium coils, thus obtaining the ultra-wide aluminium-plastic composite panel. The special devices comprise at least two single screw extrusion machines, the material outlets of the single screw extrusion machines are converged in the same charging barrel, and the charging barrel is communicated with the T-shaped die head. The ultra-wide aluminium-plastic composite panel (with a width of 1600 to 2000mm) produced by the method of meets the design requirements for large span and large breadth, and embodies an unique design style; meanwhile, the method provided by the invention has the advantages of facilitating the cutting of the panels in various specifications, reducing the waste of odd bits, saving the auxiliary materials such as keels and the like, saving the installation costs, and greatly reducing the possibility of water seepage between the panels.
Owner:JIANGSU PIVOT NEW DECORATIVE MATERIALS

Tailings reservoir filling method

The invention relates to a filling method of a tailings pond, which is characterized in that tailings are divided into two parts and then respectively transported under a water body before a tailing dam and after the tailings pond for ore drawing so as to realize the balanced and associated ore drawing cooperated by dispersed ore drawing in sections before the dam and the dispersed ore drawing in sections by underwater moving after the pond. The method of the invention controls the dispersed ore drawing in sections after the improvement of the original ore drawing technology before the dam, fully utilizes the volume of the water body after the pond and promptly adjusts the ore drawing position according to the accumulating condition of the tailings in the water body so as to avoid the formation of dry shoal in the pond, thereby ensuring that the accumulated tailings are always positioned under the water without occupying the flood discharge volume of the tailings pond. Simultaneously, according to the rising condition of the water level in the tailings pond, the transportation volume of the tailings before the dam and after the pond is promptly adjusted so as to ensure the length of the dry shoal of the tailings pond, thereby realizing the moving and balanced ore drawing in the water body after the pond so as to realize that the dispersed ore drawing in sections is adopted before the dam and after the pond.
Owner:JINDUICHENG MOLYBDENUM CO LTD

Tooth-groove type waterproof connecting structure adopting grouting method for vertical joints of assembling type building prefabricated wall boards

The invention discloses a tooth-groove type waterproof connecting structure adopting a grouting method for vertical joints of assembling type building prefabricated wall boards. The tooth-groove typewaterproof connecting structure comprises a plurality of assembling type concrete prefabricated wall boards connected in sequence from head to tail, wherein a trapezoidal groove is vertically prefabricated at the connecting side of one end of each assembling type concrete prefabricated wall board along the wall board, and a trapezoidal convex tooth corresponding to the trapezoidal groove is vertically prefabricated at the connecting side of the other end of each assembling type concrete prefabricated wall board along the wall board; after connection of the adjacent assembling type concrete prefabricated wall boards, a distance is formed between the opposite surfaces of the trapezoidal groove and the trapezoidal convex tooth to form a joint; openings of the joint, close to the outer wall surface and the inner wall surface, are sealed by a waterproof sealing material; waterproof mortar is grouted in the joint. The tooth-groove type waterproof connecting structure disclosed by the invention has the beneficial effects that the waterproof problem of the assembling type building wall boards is thoroughly solved and the waterproof performance and the production efficiency of the assembling type building are improved.
Owner:CENT SOUTH UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products