Link establishing method, communication terminal and computer readable storage medium
A calling party and called party technology, applied in the field of communication, can solve the problems of low link establishment probability of short-wave communication calls, poor stability of short-wave communication, and influence on communication quality, so as to shorten the signaling interaction time and frequency traversal time , to avoid the effect of poor channel quality
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
no. 1 approach
[0018] This application provides the first implementation of the chain building method, please refer to figure 1 , the method includes the following steps:
[0019] S110: The calling party respectively sends a first number of call requests on the first number of first frequency points in the preset frequency band.
[0020] The calling party sequentially sends the first number of call requests respectively on the first number of first frequency points in the preset frequency band. Specifically, the preset frequency band may, but not limited to, belong to the shortwave frequency band, such as a frequency band within 2MHz-30MHz; It is assumed that a first number of first frequency points are selected in the frequency band to send the call request. In addition, the first number of first frequency points may be frequency points in an available frequency set in a preset frequency band. For example, the preset frequency band includes at least one frequency set. Before initiating a ...
no. 2 approach
[0047] This application provides the second implementation of the chain building method, please refer to Figure 4 , the method includes the following steps:
[0048] S210: The called party receives a call request, wherein the received call request includes at least some of the first number of call requests respectively sent by the calling party on a first number of first frequency points in a preset frequency band.
[0049] Among them, the preset frequency band can be but not limited to belong to the short wave frequency band, for example, the frequency band within 2MHz-30MHz; Select the first number of first frequency points to send the call request. In addition, the first number of first frequency points may be frequency points in an available frequency set in a preset frequency band. For example, the preset frequency band includes at least one frequency set. Before initiating a call, the calling party detects The currently unused frequency set is the available frequency ...
no. 3 approach
[0060] This application provides the third implementation of the chain building method, please refer to Figure 5 , the method includes the following steps:
[0061] S310: The calling party respectively sends a first number of call requests on the first number of first frequency points in the preset frequency band.
[0062] The calling party can sequentially send N call requests to the called party on the available frequency set. For example, the available frequency set includes N frequency points. The calling party can use the first frequency point Fd1, Fd2, Fd3, ... , and the FdN sequentially send call requests. The waveform used is wide receiver waveform. After the caller finishes sending, the caller can switch to wide receiver mode, and then can detect and receive response messages sent on all frequency points within the wide receiver bandwidth in parallel in the wide receiver mode. For the specific process of this step, reference may be made to the process in the forego...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 


