Bridge-cut-off aluminum heat insulation window and mounting method thereof
An installation method and technology of broken bridge aluminum, applied in the field of doors and windows, can solve problems such as poor thermal insulation and thermal insulation, achieve the effects of good sound insulation and noise reduction, improve installation quality and efficiency, and excellent thermal insulation performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0048]A broken bridge aluminum insulation window and its mounting method, including the window frame 1 and form 2, the window frame 1 includes a slide chamber 3 and two mounting side panels 4, and the form 2 includes two sets of glass unit 5, each set of glasses The unit 5 includes two monolithic tempered glass 6, and the two monolithic tempered glass 6 form a vacuum chamber 7, and the vacuum chamber 7 is filled with protecting argon, and the monolithic tempered glass 6 and the mounting side panel 4 pass the elastic material 8. The fixed connection is fixed, and the mounting side plate 4 is integrally formed between the sliding chamber 3, and the heat-insulating bridge 9 is integrated between the heat-insulating bridge 9 and the mounting side panel 4, and the two mounting side panels 4 are disposed. The first isolation material filler layer 11, the second isolation material filler layer 12, the third isolation material filling layer 13, the fourth isolation material filling layer 14...
Embodiment 2
[0080]A broken bridge aluminum insulation window and its mounting method, including the window frame 1 and form 2, the window frame 1 includes a slide chamber 3 and two mounting side panels 4, and the form 2 includes two sets of glass unit 5, each set of glasses The unit 5 includes two monolithic tempered glass 6, and the two monolithic tempered glass 6 form a vacuum chamber 7, and the vacuum chamber 7 is filled with protecting argon, and the monolithic tempered glass 6 and the mounting side panel 4 pass the elastic material 8. The fixed connection is fixed, and the mounting side plate 4 is integrally formed between the sliding chamber 3, and the heat-insulating bridge 9 is integrated between the heat-insulating bridge 9 and the mounting side panel 4, and the two mounting side panels 4 are disposed. The first isolation material filler layer 11, the second isolation material filler layer 12, the third isolation material filling layer 13, the fourth isolation material filling layer 14...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com