Sand control screen pipe and design method thereof
A technology of sand control screen and design method, which is applied in the directions of earth-moving drilling, production fluid, wellbore/well components, etc., can solve the problems of poor adaptability, single design of sand control screen, damage and so on.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment approach 1
[0031] Such as figure 1 and figure 2 As shown, the present invention provides a sand control screen, including a screen body 1, the screen body 1 is provided with a plurality of slots 11, and the slots 11 penetrate the wall thickness of the screen body 1, The area of the outer opening 111 of the slot 11 is smaller than the area of the inner opening 112 of the slot 11 , and the area of the inner opening 112 of the slot 11 is determined according to the pressure of the formation and the average diameter of sand particles in the formation.
[0032] Specifically, the screen body 1 is generally in the shape of a cylinder, and a plurality of slots 11 are arranged on the screen body 1, and these slots 11 penetrate the wall thickness of the screen body 1, thereby communicating with the inner channel of the screen body 1 And the outside of the screen body 1. In this embodiment, the plurality of slots 11 on the screen body 1 are divided into a plurality of slot groups 12 arrang...
Embodiment approach 2
[0045] Such as Figure 1 to Figure 4 As shown, the present invention also provides a sand control screen design method for manufacturing the sand control screen described in Embodiment 1. The design method includes the following steps: according to the pressure of the formation and the average diameter of the sand grains in the formation The area of the inner opening 112 of the slot 11 of the sand control screen;
[0046] Wherein, the sand control screen comprises a screen body 1, and the screen body 1 is provided with a plurality of slots 11, and the slots 11 run through the wall thickness of the screen body 1, and the outer openings of the slots 11 are The area of 111 is smaller than the area of the inner opening 112 of the slot 11 .
[0047]In this embodiment, the area of the inner opening 112 of the slot 11 is also determined according to the yield of the formation.
[0048] Further, the area of the inner opening 112 of the slot 11 is also determined according ...
PUM

Abstract
Description
Claims
Application Information

- R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com