Park multi-energy operator transaction decision-making method considering demand response of data center
A data center and demand response technology, applied in data processing applications, calculations, calculation models, etc., to achieve reasonable energy management and good benefits
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment
[0134] Specifically, such as image 3 As shown, the park IES is managed by the park operator and is a complete source-network-load-storage system. The exterior of the IES in the park is mainly powered by the power network and the gas network, and the interior mainly includes PVG, energy coupling equipment, uninterruptible power supply, and energy storage configuration. Among them, the energy coupling equipment includes CHP, GB, centrifugal refrigerator and absorption refrigeration machine, the energy storage is equipped with an energy storage battery and a cold storage unit. The park supplies electric power and gas power from the upper-level network, namely the electric power network and the gas network. After coupling and conversion by the IES in the park, the output is electrical load, cooling load and heating load. When the system changes the demand for one or more energy sources, the supply and demand of other energy sources will be affected; based on this, the building c...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com