Flow soil groove buried pipe anti-floating construction method
A construction method and fluid state technology are applied in the field of anti-floating construction of fluid soil trench buried pipes, which can solve problems such as increasing construction difficulty, slowing down construction progress, and affecting the quality of pipeline filling.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0051]In order to make the object, technical solution and advantages of the present invention clearer, the present invention will be further described in detail below in conjunction with the accompanying drawings and embodiments. It should be understood that the specific embodiments described here are only used to explain the present invention, not to limit the present invention. Based on the embodiments of the present invention, all other embodiments obtained by persons of ordinary skill in the art without making creative efforts belong to the protection scope of the present invention.
[0052] The invention provides an anti-floating construction method for buried pipes in fluid soil trenches, which is used to avoid floating and offset of pipelines during the construction of buried pipes in trenches. Anti-floating is based on the initial filling height h calculated by trial 0 Carry out trench buried pipe construction, if layered filling cannot resist floating, try to calcula...