Million - kilowatts class nuclear power station reactor main bolt production process

A nuclear power plant reactor and manufacturing process technology, applied in the direction of nuclear power generation, screws, threaded fasteners, etc., can solve the problems that the tensile strength and impact value cannot meet the requirements at the same time, the batch scrapping of main bolt forgings, and mechanical performance requirements, etc., To achieve the effect of ensuring comprehensive mechanical performance, ensuring reliability and safety, and improving service life

Active Publication Date: 2008-04-30
GUIZHOU AEROSPACE XINLI CASTINGSAND FORGINGS
View PDF0 Cites 31 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0003] At present, the main bolts used in domestic nuclear power plant reactor pressure vessels, voltage stabilizers and other connecting parts are mainly imported from abroad. The main bolt forgings produced by other domestic forging plants cannot meet their mechanical performance requirements. The main defect is that the tensile strength and impact value cannot be at the same time. Meet the requirements, the impact value is too low, resulting in batch scrapping of the main bolt forgings

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Million - kilowatts class nuclear power station reactor main bolt production process

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0016] Below in conjunction with specific embodiment the present invention is described in further detail:

[0017] 1. Select the raw material 40NCDV7-03 for smelting, take samples from the ladle to test its trace element content and adjust it compared with the required value, and finally get the weight percentage content of each element as follows:

[0018] Chemical composition (wt% weight percent)

[0019] C

mn

Si

P

S

Ni

Cr

Mo

Cu

V

want

begging

0.35

0.46

0.55

0.95

0.35

0.010

0.010

1.55 ~

2.05

0.60~

1.00

0.35~

0.60

≤0.10

0.04

0.10

Reality

Measurement

0.40

0.71

0.19

0.009

0.009

1.77

0.76

0.47

0.07

0.06

[0020] Make sure it satisfies the required value;

[0021] 2. Heating of forging billet: When i...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a pile main bolt manufacturing technique of a million kilowatt grade nuclear power station. The manufacturing technique includes material-selecting, melting, heating, forging, cooling, after-forging heat treatment, defect-detecting, and forging capability heat treating. When selecting the material, the microelement content of the materials is controlled, the heat preserving duration in the intermediate temperature stage is prolonged, the heat raising and the heat preserving duration in the high temperature stage are reduced, the distortion volume in the course of the forging is controlled between 30 percent and 70 percent, the forging rate reaches 5 above; after-forging heat treatment, ultrasonic defect detecting, and forging capacity heat treating are conducted when the forging is finished. The main bolt produced according to the manufacturing technique of the invention can improve the impact value under the circumstance that the intensity keeps unchanged, theproduct can meet the RCC-M standard requirements completely, and the reliability and the safety of the pile pressure container using the main bolt of the million kilowatt grade nuclear power station can be ensured.

Description

1. Technical field [0001] The invention relates to a manufacturing process for a main bolt used in a reactor of a million-kilowatt nuclear power plant, and the main bolt is used for a sealing device of a reactor pressure vessel of a nuclear power plant. 2. Background technology [0002] The main bolt is an important and key component of the reactor pressure vessel of a nuclear power plant. It is widely used in assembly components such as a reactor pressure vessel of a nuclear power plant and a voltage stabilizer to ensure the normal operation and safety performance of the reactor pressure vessel. [0003] At present, the main bolts used in domestic nuclear power plant reactor pressure vessels, voltage stabilizers and other connecting parts are mainly imported from abroad. The main bolt forgings produced by other domestic forging plants cannot meet their mechanical performance requirements. The main defect is that the tensile strength and impact value cannot be at the same tim...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
Patent Type & Authority Applications(China)
IPC IPC(8): F16B35/00
CPCY02E30/30
Inventor 万东海张令洪大钧王宗华张自生龙开芬
Owner GUIZHOU AEROSPACE XINLI CASTINGSAND FORGINGS
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Patsnap Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Patsnap Eureka Blog
Learn More
PatSnap group products