A sluice and fast technology, applied in earthwork drilling, shaft lining, tunnel lining, etc., can solve the problems of heavy transportation, insufficient construction speed, large engineering volume, etc., and achieve the effects of reduced transportation volume, rapid construction and stable performance
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0018] Refer to attached Figure 1~3 The method for rapidly constructing the sluice wall provided by the embodiment of the present invention can be carried out through the following five steps:
[0019] a. To build a temporary retaining wall 1, first bury the aqueduct 6 in advance, then put the clay into the clay bag, and use the clay bag to transport the tunnel vertically to build the temporary retaining wall 1, so that most of the gushing water is forced into the placed guide Inside the water pipe 6;
[0020] b. To build a solid temporary water retaining wall 2, first build a temporary water retaining stone wall 10 in the vertical transport lane at the front end, and use non-foaming Bolei between the temporary water retaining material stone wall 10 and the temporary water retaining wall 1 A solid temporary water retaining wall 2 is built by using the barrel block 13 as the aggregate, and at least one row of threaded steel resin anchor rods 9 connected with the barrel body 1...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com