Connection method of titanium roll and stainless steel belt and transition leading belt utilized by connection method
A transition leader and stainless steel strip technology, applied in the direction of welding medium, welding equipment, welding equipment, etc., can solve problems such as broken strips, easy cracking, equipment scratches, etc., to reduce production costs, avoid direct welding, and improve production efficiency effect
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
example 1
[0028] First, prepare a stainless steel plate with a width of 1150 mm, and cut four evenly distributed rectangular holes along the transverse direction at a distance of 90 mm from the end of the stainless steel plate. The length and width of the rectangular holes are 150 mm and 120 mm respectively; Cut 4 pieces of connectors, the width is 90mm, and the length is 460mm; then, place the pure titanium plate under the stainless steel plate, the end of the titanium plate can completely cover the rectangular hole on the stainless steel plate, and then connect one end of the 4 pure titanium connectors Lay on the titanium plate in turn, and put the other end on the titanium plate through the rectangular hole; finally, use the pre-prepared titanium plate base material welding wire to completely weld each connecting piece and the titanium plate, and weld the stainless steel plate and the titanium plate The end of the stainless steel plate at the lap joint is treated with a cutting arc ed...
example 2
[0031] First, prepare a stainless steel plate with a width of 1050mm, and cut 3 evenly distributed rectangular holes along the transverse direction at a distance of 70mm from the end of the stainless steel plate. The length and width of the rectangular holes are 130mm and 100mm respectively; 3 pieces of connectors with a width of 70mm and a length of 420mm; then, place the titanium plate under the stainless steel plate so that the end of the titanium plate completely covers the rectangular hole, and then put one end of the 3 connectors on the titanium plate in turn, The other end passes through the rectangular hole and rests on the titanium plate; finally, use the pre-prepared titanium plate base metal welding wire to completely weld the three connecting pieces and the titanium plate, and check the stainless steel plate at the overlap between the stainless steel plate and the titanium plate. That end is treated with a cutting arc edge to reduce its scratches on the unit equipme...