Planting structure in arid desert regions and planting method of planting structure
A technology of planting structure and covering film, which is applied in the field of plant planting structure and its planting, can solve the problems of sandy soil leakage and evaporation, low plant planting survival rate, and difficult vegetation restoration, achieve high survival rate, improve collection and storage function, the effect of reducing water leakage
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
specific Embodiment 1
[0047] (1) Planting in the weathered soil layer of Pisha sandstone
[0048] In order to simulate the environment in the Pisha sandstone area, a 1.2m×1.2m×1.0m planting box was made with a wooden box and filled with weathered Pisha sandstone sand. Excavate deep 70cm in sandbox, the planting hole that upper surface diameter is 85cm. Evenly install 4 overflow pipes with a diameter of 1.0cm at half the depth of the planting pit, and install 1 overflow pipe with a diameter of 0.6cm at the bottom (10cm above the bottom of the planting pit). The length of the overflow pipes is 10cm. Both ports of the overflow pipe are filled with screens.
[0049] Pisha sandstone comes from Zhungeer Banner, Inner Mongolia Autonomous Region. Pisha sandstone soil samples are weathered red sandstone with a maximum particle size of 10mm, gravel with edges and corners, and a specific gravity of 2.65 g / cm3. 70% of the Pisha sandstone soil samples have a particle size distribution of Between 0.05 and 2.0m...
specific Embodiment 2
[0055] In order to simulate the arid desert environment, a 1.5m×1.5m×1.0m sandbox was made with a wooden box and filled with river sand. Excavate deep 70cm in sandbox, the planting hole that upper surface diameter is 85cm. Install four overflow pipes with a diameter of 1.0 cm evenly at half the depth of the planting pit, and install one overflow pipe with a diameter of 0.6 cm at the bottom of the planting pit (10 cm above the bottom of the planting pit). For 10cm, the two ports of the overflow pipe are filled with strainers.
[0056] Adopt the same hydrophilic polyurethane resin as specific example 1 to spray on the bottom and side of the planting pit and quickly solidify to form an anti-seepage film. The concentration of the W-OH solution is 4.0%, and it is carried out at the bottom and the side of the planting pit with a double liquid pump. Spraying, the spraying time of each planting pit is generally within 0.5 minutes and the spraying construction can be completed. Then,...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com