Gypsum slurry pouring time calculation method
A calculation method and technology of gypsum slurry, which are applied in the fields of calculation, instrumentation, electrical and digital data processing, etc., can solve the problems of high failure rate, unreliability and low efficiency of the system.
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0030] The preferred embodiments of the present invention will be described in detail below in conjunction with the accompanying drawings; it should be understood that the preferred embodiments are only for illustrating the present invention, rather than limiting the protection scope of the present invention.
[0031] Such as figure 1 Shown, a kind of calculation method of gypsum slurry pouring time, comprises the following steps:
[0032] 1) Extract the structural model according to the actual gypsum slurry pouring bin, the upper half of the gypsum slurry pouring bin involved in the present invention is a cylindrical bin, and the lower half is a structure of a conical hopper, such as figure 2 shown;
[0033] 2) The establishment of the slurry flow formula at the outlet of the gypsum slurry filling bin. According to the structural model established in step 1), considering that the gypsum slurry is a uniform solid-liquid mixed viscous non-Newtonian fluid, the viscous fluid A...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 