[0016] A construction method for precise installation of a steel pipe column, comprising the following steps:
[0017] (1) After the surveyors set out the 4 coordinates of the steel pipe column, use C20 concrete to harden the ground of the hole before construction. The hardened area is 8m2, and the hardened thickness is 40cm. Tic-tac-toe 1;
[0018] (2) When hardening the ground of the orifice, 3 U-shaped steel bar slots are pre-embedded in each corner of the hardened position corresponding to the four corners of the well-shaped frame 1, and each U-shaped steel bar slot is made of C25 steel bar , 300mm in length, 20cm below the ground and 10cm above the ground when pre-embedded. When installing the well-shaped frame 1, insert the well-shaped frame 1 into the U-shaped steel bar slot, and weld the well-shaped frame 1 with the U-shaped steel bar slot;
[0019] (3) Place the 15t mechanical jack 2 between the well-tac-toe frame 1 and the hardened ground, then put the positioner 3 ...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More - R&D
- Intellectual Property
- Life Sciences
- Materials
- Tech Scout
- Unparalleled Data Quality
- Higher Quality Content
- 60% Fewer Hallucinations
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2025 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com