Rainwater garden system for community rainwater flow diversion, peak clipping and ecological purification
A rain garden and ecological purification technology, applied in waterway systems, drinking water installations, general water supply conservation, etc., can solve problems that have not been discovered and have not been involved in rain garden systems
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0029] A rain garden system for community rainwater diversion, peak shaving and ecological purification is installed in the high-rise residential area of Baoshan Yanghang Residential Community in Shanghai to collect runoff generated by community roof rainfall.
[0030] The community is a 12-story high-rise residence with a plot ratio of 4, a green area of 40%, and a roof area of 33%. The area enclosed by the outer circle of the annular slope of the pretreatment facility 7 is 50m 2 , the shape is kidney-shaped, the bottom length is 10.0m, the width is 6.0m, and the structure thickness is 200cm. The pretreatment facilities include that the slope of the circular slope is 33° and the width is 70cm; the thickness of the gravel covered on the slope is 6cm, and the particle size is 4cm; the bottom of the aquifer 12 is about 20cm lower than the green land 9; The thickness of the fine stone is 5cm, and the particle diameter is 1cm; The vegetation of planting layer 14 is the vine...
Embodiment 2
[0033] A rain garden system for community rainwater diversion, peak shaving and ecological purification was installed in the residential green space of Shenghui Community in Baoshan Greenland Sea Area, Shanghai, to collect the runoff generated by community roof rainfall.
[0034] The community is a 6-storey multi-storey residence with a plot ratio of 1.5, a green area of 40% and a roof area of 25%. The area enclosed by the outer circle of the annular slope of the pretreatment facility 7 is 20m 2 , the shape is kidney-shaped, the bottom length is 8.0m, the width is 4.0m, and the structure thickness is 80cm. The slope of the annular slope of the pretreatment facility 7 is 35°, and the width is 40cm; the thickness of the gravel covered on the slope is 4cm, and the particle size is 4cm; the bottom of the aquifer 12 is about 15cm lower than the green sag; The thickness of the stone is 5cm, and the particle size is 1cm; the planting layer 14 vegetation is dwarf Ophiopogon japon...
PUM
Property | Measurement | Unit |
---|---|---|
Area | aaaaa | aaaaa |
Thickness | aaaaa | aaaaa |
Width | aaaaa | aaaaa |
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com