Handheld underwater grouting pile top-surface elevation control early-warning device and method

A technology of elevation control and early warning devices, which is applied in the direction of measuring devices, height/level measurement, instruments, etc., can solve problems such as waste of concrete, delay in construction progress, and failure of devices to work, so as to reduce construction costs, improve control accuracy, and improve construction efficiency effect

Active Publication Date: 2016-09-07
SHANDONG UNIV
View PDF4 Cites 2 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] 1) The volume is too bulky
[0005] 2) The detection work needs to be carried out at regular intervals, which greatly delays the construction progress
[0006] 3) Relying entirely on the experience of construction personnel, it is very easy to cause serious over-irrigation
[0007] 4) Overfilling causes waste of concrete, and a lot of manpower and financial resources are wasted in removing pile heads
[0008] 5) Concrete waste is very serious to environmental pollution
This device has the following disadvantages: 1) The proportion of mud in each area is different, and the proportion of different grades of concrete also has a large difference
Therefore, it will inevitably cause false alarms of the device, which will affect the quality of the entire pile body and may cause economic losses.
2) During the pouring process, the upwelling surface of the concrete is irregular, and the upwelling surface when it is about to reach the design elevation will be higher than the elevation surface, which will also cause false alarms
Due to the complex environment of the construction site, this device will undoubtedly increase the workload of the on-site staff, and the grab bucket of the device uses a large number of bolt structures, and the sand particles in the mud will block the bolts after entering the bolts, which will cause the device to fail to work

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Handheld underwater grouting pile top-surface elevation control early-warning device and method
  • Handheld underwater grouting pile top-surface elevation control early-warning device and method
  • Handheld underwater grouting pile top-surface elevation control early-warning device and method

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0050] The present invention is described in detail below in conjunction with accompanying drawing:

[0051] Such as figure 1 As shown, a hand-held early warning device for controlling the elevation of the top surface of underwater grouting piles includes: a hand-held alarm device, a waterproof wire 1-2, and an underwater airtight probe 1-3; wherein, the wire slot 9 on the hand-held alarm device -5 is connected with one end of the waterproof wire 1-2, and the other end of the waterproof wire 1-2 is connected with the positive and negative poles of the DC motor of the underwater airtight probe 1-3, and waterproof treatment is done.

[0052] Such as Figure 7 As shown, the handheld alarm device includes a display screen, an internal circuit, a power supply and a switch, an operation panel 9-3 and a wire slot 9-5. There are three buttons on the operation panel 9-3, and the speaker port 9-2, the power switch 9-4 and the wire slot 9-5 are positioned at the bottom of the hand-held...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a handheld underwater grouting pile top-surface elevation control early-warning device and method. The handheld underwater grouting pile top-surface elevation control early-warning device comprises a handheld alarm, a waterproof lead and an underwater closed probe. The handheld alarm is provided with a main controller, a power supply, a signal processing circuit and an alarm circuit inside, wherein the power supply, the signal processing circuit and the alarm circuit are connected with the main controller respectively. A motor is arranged in the underwater closed probe. When concrete is grouted, coarse aggregate rises to the designed elevation, the motor inside the underwater closed probe rotates in a resistant manner, and shoot-up current signals generated by the resistant rotation are connected to the handheld alarm through the waterproof lead to generate alarm signals. The handheld underwater grouting pile top-surface elevation control has the advantages of simple structure and convenience in operation and can be accepted by on-site constructors. Through test on the construction site, pile top elevation of the underwater grouting pile can be accurately controlled, within 5 cm, and control accuracy is remarkably improved as compared with that of conventional pile detection methods.

Description

technical field [0001] The invention relates to the related technical field of construction engineering equipment, in particular to a hand-held early warning device and method for controlling the top elevation of underwater grouting piles. Background technique [0002] Concrete is the most common construction material in civil engineering construction. It has a wide range of uses and plays an important role in the construction of buildings and the like. In the construction of buildings, the construction of the lower foundation is the most important, which directly determines the safety and stability of the upper structure. Most of the lower concrete foundations are pile foundation projects, and all of them are concealed pile foundations, that is, the design elevation of the pile top is below the ground and the borehole is filled with mud. Human eyes cannot directly judge the elevation of the top surface of the foundation pile. [0003] The most commonly used detection metho...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): G01C5/00
CPCG01C5/00
Inventor 崔伟付宪章徐宝军郑晓吕高航杨殿斌张志武胡蒙蒙刘春阳
Owner SHANDONG UNIV
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products