Network equipment starting time testing method and testing control bench

A technology of network equipment and start-up time, applied in the field of network communication, can solve the problems that cannot truly reflect the normal communication recovery ability of network equipment, and achieve the effects of more targeted upgrades, improved pertinence and effectiveness, and avoidance of efficiency

CN106100939AActive Publication Date: 2016-11-09MAIPU COMM TECH CO LTD
5 Cites 9 Cited by

Patent Information

Authority / Receiving Office
CN · China
Current Assignee / Owner
Publication Date
2016-11-09

Smart Images

  • Figure 1
    Figure 1
  • Figure 2
    Figure 2
  • Figure 3
    Figure 3
Patent Text Reader

Abstract

The embodiment of the invention provides a network equipment starting time testing method and a testing control bench. When network equipment to be tested is powered on, a message sending port of a network tester is controlled to send testing messages to the network equipment to be tested through auxiliary testing equipment at a preset message sending rate, and after the network equipment to be tested receives the testing messages, the testing messages are sent back to the network tester through the auxiliary testing equipment. The testing message receiving rate of a message receiving port of the network tester is captured. When the testing message receiving rate equals to a preset message sending rate, the network tester is controlled to stop sending testing messages, and the numbers of sent testing messages and received testing message of the network tester are obtained. The complete starting time of the network equipment is obtained based on the numbers of sent testing messages and received testing message of the network tester, and the preset message sending rate. Through the testing method, the complete starting time of network equipment, reflecting real normal communication recovery capability of the network equipment can be obtained.
Need to check novelty before this filing date? Find Prior Art

Description

technical field

[0001] The invention relates to the technical field of network communication, in particular to a method for testing the startup time of network equipment and a test console. Background technique

[0002] The operation quality and efficiency of network equipment are directly related to the user experience in the interconnected network environment, and further to the market competitiveness of network equipment products. In the stage of product trial research or finalization of product design for network equipment, it is necessary to conduct multiple performance index tests on trial research samples or finalized products, and use the performance test results as the basis for further product improvement. In the field of network communication technology, the normal communication recovery capability of network equipment is usually evaluated by the startup time of network equipment.

[0003] The existing method for testing the startup time of the network equipment ...

Examples

no. 1 example

[0052] The first embodiment takes the startup time test of a network device stereotyped product as an example to describe the method for testing the startup time of the network device in the present invention.

[0053] Network equipment refers to the node transmission equipment in the wired or wireless network, which performs data interactive communication with other node transmission equipment or terminal equipment according to the network transmission protocol. For network equipment, the restart time after hardware or software reset is an important performance index to evaluate the normal communication recovery ability of network equipment, and it is also the basis for further improvement of network equipment development samples in the research and development stage.

[0054] As an intermediate node device for network data exchange and forwarding, network devices need to control and manage network data flow, control and manage the interval between data frames, control and man...

no. 2 example

[0106] The second embodiment provides a testing console. The test console can be applied to the application environment of the foregoing method embodiments.

[0107]The network equipment start-up time testing device of the test console provided by the second embodiment of the present invention has the same technical concept, realization principle, technical effect produced, and technical problems that can be solved as the foregoing method embodiments, and those skilled in the art can With reference to the detailed description of the corresponding method steps in the foregoing method embodiments of the present invention, the device for testing the startup time of the network device of the test console provided in the second embodiment of the present invention can be understood.

[0108] Figure 5 It is a schematic structural diagram of a test console provided by an embodiment of the present invention. The test console is applied in a test system including a network tester, a ...