Dismantling and installation construction method of whole group of bridges with upper span on existing line
A construction method and existing line technology, applied in the field of dismantling and installation of bridges spanning existing lines
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0064] Such as figure 1A kind of whole group demolition and installation construction method of the existing line bridge with upper span shown, carry out whole group demolition and installation construction respectively to a plurality of beam sections 14 of the old beams to be removed from front to back, and multiple The entire set of beam section 14 is removed and installed in the same way; the old beam to be removed is a bridge girder spanning the existing railway line, and the old beam to be removed is assembled from front to back by a plurality of beam sections 14 to be removed. A plurality of beam sections 14 to be removed have the same structure and are all reinforced concrete beam sections. The beam sections 14 to be removed are assembled from M reinforced concrete T beams 15 from left to right, wherein M is a positive integer and M≥3; the front and rear ends of the beam section 14 to be removed are respectively supported on a supporting pier, and the bridge deck paveme...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com