Railway maintenance electro-hydraulic integration machine for replacing sleeper

An electromechanical hydraulic and sleeper technology, applied in track maintenance, roads, tracks, etc., can solve problems such as low work efficiency, sleeper damage, time-consuming and labor-intensive problems

Inactive Publication Date: 2017-01-11
CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP
View PDF4 Cites 0 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0002] During the long-term use of railway sleepers, due to natural settlement and vibration, some railway sleepers sink and need maintenance. Individual sleepers are damaged and need to be replaced in time. In the process of sleeper replacement, manual work is used, which is time-consuming and laborious. , the work efficiency is low, and the work cannot be completed within the effective train passage gap (commonly known as: skylight)

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Railway maintenance electro-hydraulic integration machine for replacing sleeper
  • Railway maintenance electro-hydraulic integration machine for replacing sleeper
  • Railway maintenance electro-hydraulic integration machine for replacing sleeper

Examples

Experimental program
Comparison scheme
Effect test

Embodiment Construction

[0186] see figure 1 and figure 2 Shown, the present invention is made up of tamping ballast leveling device 1, road shoulder and ballast bed shaping device 2, grab stone clearing device 3, ballast collecting and discharging device 4, pillow end stone cleaning device 5, sprocket stone removing device 6 , Four nuts synchronous assembly and disassembly device 7, the first rail lifting device 8, rail transfer and push-pull sleeper device 9, lifting sleeper device 15, generator 18, hydraulic system and control system box 19 and rail car 20 composition. The rail car is equipped with multiple casters 201 and two longitudinal beams 202, tamping ballast leveling device 1, road shoulder and ballast bed shaping device 2, grab stone cleaning device 3, ballast collecting and discharging device 4, pillow end stone cleaning device 5. The sprocket stone removal device 6, the four-nut synchronous assembly and disassembly device 7, the first rail lifting device 8, the switching rail and push-...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

PUM

No PUM Login to View More

Abstract

The invention discloses a railway maintenance electro-hydraulic integration machine for replacing sleeper. The railway maintenance electro-hydraulic integration machine for replacing sleeper comprises a tamping ballast leveling device, a runway shoulder and ballast bed trimming device, a grab bucket stone-cleaning device, a ballast discharge device, a sleeper end stone-cleaning device, a sprocket stone discharge device, a four-nuts synchronous installation and disassembly device, a first rail lifting device, a sleeper transfer and push-pull device, a hoisting and swinging sleeper device, a rail vehicle, generators, a hydraulic system and a control system box. The railway maintenance electro-hydraulic integration machine for replacing sleeper makes a work device quickly aligned to a work position, the ballasts are automatically discharged from the gap between sleepers, the outside of a sleeper end and the ballast bed below a steel rail; sandy soils in the ballast are automatically separated, the ballast are automatically used to backfill the gap between the sleepers at two sides of the replaced sleeper for tamping and leveling, the shape of runway shoulder and ballast bed are repaired, the synchronous installation and disassembly of four nuts are achieved, the fatigue life of the bolt is improved, and the reliability of the connection between the sleeper and he steel rail are ensured. The sleeper transfer and push-pull device is an integrated device, has compact structure, and is suitable for various works of the sleeper changing in straight-line and curve-line rail sections. The efficiency of the sleeper changing is high.

Description

technical field [0001] The invention relates to a railway maintenance machine, in particular to a railway maintenance electro-hydraulic integrated machine for replacing sleepers. Background technique [0002] During the long-term use of railway sleepers, due to natural settlement and vibration, some railway sleepers sink and need maintenance. Individual sleepers are damaged and need to be replaced in time. In the process of sleeper replacement, manual work is used, which is time-consuming and laborious. , the work efficiency is low, and the work cannot be completed in the effective train passage gap (commonly known as: skylight). Contents of the invention [0003] The purpose of the present invention is to provide a kind of railway maintenance electro-hydraulic integrated machine for replacing sleepers. [0004] The present invention consists of a tamping ballast leveling device, a road shoulder and ballast bed modification device, a grab stone cleaning device, a ballast ...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to View More

Application Information

Patent Timeline
no application Login to View More
IPC IPC(8): E01B29/10E01B27/10E01B27/20
CPCE01B29/10E01B27/10E01B27/20E01B2203/141
Inventor 宋伟俊
Owner CHINA RAILWAY CONSTR BRIDGE ENG BUREAU GRP