Construction measurement method of projecting points by reverse coordinate transfer of tunnel shaft
A technology for construction surveying and vertical wells, which is applied in the directions of surveying devices, height/horizontal surveying, surveying and navigation, etc., to achieve the effects of short occupation time of the well, strong practicability and fast measurement speed
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0043] The present invention will be further described below in conjunction with the accompanying drawings and embodiments.
[0044] Embodiment, tunnel shaft reverse coordinate transfer projecting point construction measurement method, see Figure 1-Figure 4 As shown, there is an inverted arch vertical hole on the bottom surface of the vertical shaft inverted arch at the control point buried at the bottom of the shaft, and a bracket S1 is arranged in the inverted arch vertical hole, and a spherical surface with openings on the upper and lower sides is arranged on the bracket. Groove S4, there is a rolling ball S3 in the universal rotation in the spherical groove, the laser plumb instrument S2 is fixed on the rolling ball at the opening end of the spherical groove, and is fixed vertically downward on the rolling ball at the opening end of the spherical groove There is a suspension rod S5, and a gravity ball S6 is fixed at the lower end of the suspension rod, and the laser cente...
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com