Metro station with double-hole double-layer ejector pipe space combination
A space combination and subway station technology, applied in underground chambers, mining equipment, earthwork drilling and mining, etc., can solve problems such as inability to meet the functional and technological requirements of subway stations, high engineering costs, and difficult implementation conditions, so that the project can be implemented Strong performance, reasonable setting, and the effect of reducing construction risks
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment 1
[0023] see figure 2 In this embodiment, No. 1 pipe-jacking double-deck tunnel 1 and No. 2 pipe-jacking double-deck tunnel 2 are side-type subway stations, wherein No. 1 line 8 and No. 2 line 9 are all adjacent to the port of the cross-connecting passage 4 .
Embodiment 2
[0025] see image 3 , No. 1 pipe-jacking double-deck tunnel 1 and No. 2 pipe-jacking double-deck tunnel 2 in this embodiment are stacked line subway stations, wherein said No. 1 pipe-jacking double-deck tunnel 1 is provided with a station hall 5 and a pair of The escalators 7 and the station hall 5 are arranged on both sides of a pair of escalators 7; the No. 1 line 8 and the No. 2 line 9 and their corresponding platforms 6 are respectively arranged on the upper and lower floors of the No. 2 pipe jacking double-layer tunnel 2 inside the space.
PUM
Abstract
Description
Claims
Application Information
- R&D Engineer
- R&D Manager
- IP Professional
- Industry Leading Data Capabilities
- Powerful AI technology
- Patent DNA Extraction
Browse by: Latest US Patents, China's latest patents, Technical Efficacy Thesaurus, Application Domain, Technology Topic, Popular Technical Reports.
© 2024 PatSnap. All rights reserved.Legal|Privacy policy|Modern Slavery Act Transparency Statement|Sitemap|About US| Contact US: help@patsnap.com