Metro station with double-hole double-layer ejector pipe space combination

A space combination and subway station technology, applied in underground chambers, mining equipment, earthwork drilling and mining, etc., can solve problems such as inability to meet the functional and technological requirements of subway stations, high engineering costs, and difficult implementation conditions, so that the project can be implemented Strong performance, reasonable setting, and the effect of reducing construction risks

Pending Publication Date: 2018-01-09
CHINA RAILWAY LIUYUAN GRP CO LTD +1
View PDF8 Cites 4 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

There are construction problems and contradictions in the construction of stations or sections by open-cut method, combination of open and dark, and underground excavation methods, such as difficult implementation conditions, high construction risks, uncontrollable construction period, and high early-stage engineering costs.
It is a better way to solve the problem of subway construction by using the pipe jacking method in the subway construction in the central area of ​​the city. The current pipe jacking space is small, and a single space cannot meet the functional and technological requirements of the subway station. Oversized pipe jacking still has equipment manufacturing, On-site implementation and other issues, how to realize the function of the subway station by combining the implementable pipe jacking space is an urgent problem to be solved in the current subway construction

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Metro station with double-hole double-layer ejector pipe space combination
  • Metro station with double-hole double-layer ejector pipe space combination
  • Metro station with double-hole double-layer ejector pipe space combination

Examples

Experimental program
Comparison scheme
Effect test

Embodiment 1

[0023] see figure 2 In this embodiment, No. 1 pipe-jacking double-deck tunnel 1 and No. 2 pipe-jacking double-deck tunnel 2 are side-type subway stations, wherein No. 1 line 8 and No. 2 line 9 are all adjacent to the port of the cross-connecting passage 4 .

Embodiment 2

[0025] see image 3 , No. 1 pipe-jacking double-deck tunnel 1 and No. 2 pipe-jacking double-deck tunnel 2 in this embodiment are stacked line subway stations, wherein said No. 1 pipe-jacking double-deck tunnel 1 is provided with a station hall 5 and a pair of The escalators 7 and the station hall 5 are arranged on both sides of a pair of escalators 7; the No. 1 line 8 and the No. 2 line 9 and their corresponding platforms 6 are respectively arranged on the upper and lower floors of the No. 2 pipe jacking double-layer tunnel 2 inside the space.

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention discloses a metro station with double-hole double-layer ejector pipe space combination, and relates to the technical field of metro stations. The metro station comprises a first ejectorpipe double-layer tunnel and a second ejector pipe double-layer tunnel which are symmetrically arranged. The first ejector pipe double-layer tunnel communicates with the second ejector pipe double-layer tunnel through a transverse connecting channel. The outer sides of the tops of the first ejector pipe double-layer tunnel and the second ejector pipe double-layer tunnel are each provided with an inlet and outlet channel. Inner spaces of the first ejector pipe double-layer tunnel and the second ejector pipe double-layer tunnel are each divided into an upper layer space and a lower layer space through structural plates. Each upper layer space is internally provided with a platform and an escalator. A first line is arranged in the lower layer space of the first ejector pipe double-layer tunnel, and a second line is arranged in the lower layer space of the second ejector pipe double-layer tunnel. The metro station can effectively meet the station process and function, meanwhile, the project practicability is high, the construction risk can be reduced, pipeline relocation is reduced, traffic reconciliation is optimized, and the practicability is higher.

Description

technical field [0001] The invention relates to the technical field of subway stations, in particular to a subway station with space combination of double-hole and double-layer pipe jacking. Background technique [0002] In densely built urban areas, there are many ground and underground structures and pipelines, and the road traffic is heavy. There are construction problems and contradictions such as difficult implementation conditions, high construction risks, uncontrollable construction period, and high preliminary engineering costs in the construction of stations or sections by open-cut method, combination of open and dark, and underground excavation methods. It is a better way to solve the problem of subway construction by using the pipe jacking method in the subway construction in the central area of ​​the city. The current pipe jacking space is small, and a single space cannot meet the functional and technological requirements of the subway station. Oversized pipe jac...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
Patent Type & Authority Applications(China)
IPC IPC(8): E21D13/00E21D9/14
Inventor 丁建隆刘辉孙成伟严东金德成李现森姜宝臣范恒秀朱世友谭晓春唐上明黄敏康
Owner CHINA RAILWAY LIUYUAN GRP CO LTD
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products