Communication engineering pre-burying well with cable sliding mechanism
A technology of sliding mechanism and communication engineering, which is applied in infrastructure engineering, water conservancy engineering, artificial islands, etc. It can solve problems such as unfavorable construction projects, easy damage to the surface of cables, and time-consuming and labor-intensive operations. Time-saving and labor-saving, the effect of firm and stable structure
- Summary
- Abstract
- Description
- Claims
- Application Information
AI Technical Summary
Problems solved by technology
Method used
Image
Examples
Embodiment Construction
[0015] see figure 1 with 2 The present invention provides a pre-buried well for communication engineering with a cable sliding mechanism, including a cable well 2, the cable well 2 is formed by splicing a prefabricated bottom plate 21 and a side plate 22, and the upper end of the side plate 22 is connected to There is a well base 24, the top of the well base 24 is provided with a concave platform for assembling the cover plate 25, the side plate 22 is provided with a cable port 23, and a cable sliding mechanism is provided in the cable well 2, The cable sliding mechanism includes a bracket 1, and the bracket 1 is provided with a roller assembly perpendicular to the laying direction of the communication cable, and the roller assembly includes a first roller 11, a second roller 12 and a third roller The first roller 11 is horizontally arranged on the support 1, and the second roller 12 and the third roller 13 are arranged obliquely on both sides of the first roller 11 respectiv...
PUM
Login to View More Abstract
Description
Claims
Application Information
Login to View More 