Bill of quantities (BOQ)-based completion settlement management method for technical renovation project of power grid

A technology of bill of quantities and management method, which is applied in the field of completion settlement management of power grid technical transformation projects based on the bill of quantities, can solve the problems of difficult completion settlement management and effective data management and control, and achieve the effect of improving work efficiency and accuracy.

Inactive Publication Date: 2018-03-23
EAST INNER MONGOLIA ELECTRIC POWER COMPANY +1
View PDF2 Cites 8 Cited by
  • Summary
  • Abstract
  • Description
  • Claims
  • Application Information

AI Technical Summary

Problems solved by technology

[0004] The purpose of the present invention is to solve the defect in the prior art that it is difficult to carry out effective data management and control on the completion settlement

Method used

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
View more

Image

Smart Image Click on the blue labels to locate them in the text.
Viewing Examples
Smart Image
  • Bill of quantities (BOQ)-based completion settlement management method for technical renovation project of power grid

Examples

Experimental program
Comparison scheme
Effect test

Example Embodiment

[0034] In order to have a further understanding and understanding of the structural features of the present invention and the effects achieved, the preferred embodiments and drawings are used in conjunction with detailed descriptions, which are described as follows:

[0035] Such as figure 1 As shown, the method for the settlement and management of power grid technological transformation project completion based on the bill of quantities of the present invention includes the following steps:

[0036] The first step is to generate the application for completion acceptance. The completion application program module compiles the completion settlement documents and submits the commissioning acceptance request, obtains the engineering quantity list and contract determination number of the project, and generates the completion acceptance application form after the completion acceptance application is associated with the quantity list and contract through the quantity list and contract nu...

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

PUM

No PUM Login to view more

Abstract

The invention provides a bill of quantities (BOQ)-based completion settlement management method for the technical renovation project of a power grid. Compared with the prior art, the defect that the effective data management and control is difficult to carry out on the completion settlement management in the prior art is overcome. The method comprises the following steps of generating a construction acceptance application form; compiling a completion settlement file; checking the completion settlement file; and generating a settlement report and a settlement list. According to the method, therapid entry of construction acceptance data in the technical renovation project of the power grid is realized according to the BOQ pricing mode. Meanwhile, the completion settlement file and the construction acceptance application form are automatically generated. The working efficiency and the working accuracy of the completion settlement management are improved.

Description

technical field [0001] The invention relates to the technical field of data processing, in particular to a management method for completion settlement of a power grid technical renovation project based on a bill of quantities. Background technique [0002] Completion settlement management is the final stage of the technical transformation project of the power grid, and it is an important link to comprehensively assess the results of the technical transformation project of the power grid and to test the quality of engineering design and construction. At present, there are problems in the completion settlement of the quota method, such as false reporting of engineering measurement, arbitrary high quotas for settlement unit prices, and more additions and less deductions in the calculation of fees, and the settlement efficiency is relatively low. The bill of quantities pricing model clarifies the pricing methods for design changes and additional engineering items, and the settle...

Claims

the structure of the environmentally friendly knitted fabric provided by the present invention; figure 2 Flow chart of the yarn wrapping machine for environmentally friendly knitted fabrics and storage devices; image 3 Is the parameter map of the yarn covering machine
Login to view more

Application Information

Patent Timeline
no application Login to view more
IPC IPC(8): G06Q10/10G06Q30/02G06Q50/06
CPCG06Q10/103G06Q30/0283G06Q50/06
Inventor 谢志强苗春雨李博周刚杜少平曹瑞德李文鹏冯新文李文波王昌君
Owner EAST INNER MONGOLIA ELECTRIC POWER COMPANY
Who we serve
  • R&D Engineer
  • R&D Manager
  • IP Professional
Why Eureka
  • Industry Leading Data Capabilities
  • Powerful AI technology
  • Patent DNA Extraction
Social media
Try Eureka
PatSnap group products